State Board Ruling Stalls Oil Terminal Progress
09.13.2013 - NEWS

September 13, 2013 [Seattle Pi] - A state board ruling has stalled progress on two crude-by rail oil terminals proposed for Gray's Harbor.


The Chronicle of Centralia reported Wednesday that the Washington State Shorelines Hearings Board has ruled that certain aspects of the terminals’ proposals must be corrected.

The ruling, issued Tuesday, was in response to a multi-jurisdictional suit challenging the oil terminals. A more specific report, identifying what must be corrected in the permits, will be issued later.

Westway Terminal Company and Imperium Renewables both seek to ship tens of millions of barrels of crude oil through Grays Harbor each year.

The challenge was filed by The Quinault Indian Nation and a coalition of conservation groups that argued that regulatory agencies failed to adequately evaluate the risks of oil spills from trains and ships.

Heikki Malinen Appointed as the President and CEO of Neste
05.03.2024 - NEWS
May 03, 2024 [Petrol Plaza]- Neste Corporation’s Board of Directors has appointed Heikki Maline... Read More
Belgian Port Plans to Build €250m Hydrogen and Ammonia Export Terminal in Namibia
05.03.2024 - NEWS
May 03, 2024 [Esquare]- The Port of Antwerp-Bruges plans to build a €250 million ($267 million)... Read More
European Commission Grants €720 Million to Renewable Hydrogen Projects
05.03.2024 - NEWS
May 03, 2024 [Offshore Energy]- European Commission has awarded nearly €720 million to seven re... Read More
Rotterdam LNG Bunkering Volumes Jump in Q1
05.03.2024 - NEWS
May 03, 2024 [LNG Prime]- LNG bunkering volumes in the Dutch port of Rotterdam reached a record l... Read More