Wyoming Oil Logistics Firm to Build Unit Train Facility at Guernsey Hub
01.30.2013 - NEWS

January 30, 2013 [OPIS] - Eighty-Eight Oil LLC (EEOLLC) said late on Monday that its plans to construct and operate a unit train facility on BNSF Railway's mainline near the Guernsey crude oil pipeline hub.


Eighty-Eight Oil LLC, established in 1963, is a privately held crude oil marketing and logistics company within True companies of Casper, Wyo.

EEOLLC markets crude oil from the Rocky Mountain region throughout the United States. The True companies are privately owned and operated companies with operations throughout the United States.

The facility will be directly connected to EEOLLC’s existing Guernsey crude oil terminal which has 2 million bbl of storage and currently receives crude oil from Butte Pipeline, Belle Fourche Pipeline, Platte Pipeline, and the Rocky Mountain Pipeline System.

The Guernsey terminal also maintains truck unloading facilities. The facility will be the first rail transloading terminal capable of loading multiple crude types including those from the Williston Basin (Bakken), the Powder River Basin (Niobrara), Southwest Wyoming, Big Horn Basin and Canada.

“Because this terminal is being designed to handle multiple crude types, we are confident of its long term viability,” says Jerry Herz, Superintendent of EEOLLC.

“Further, by connecting our terminal to BNSF’s expansive railway system, we can provide producers of the Rocky Mountains and Canada further flexibility in adding value to their production and transporting it to markets throughout the United States,” he added.

As demand continues to rise, rail has stepped up to provide a more flexible, long-term, and economical option to ship crude oil to destination markets throughout the East, West and Gulf coasts and along the Mississippi River, said ” said Dave Garin, BNSF group vice president, industrial products.

With completion expected later this year, the facility will initially include three rail loop tracks and required tankage for unit train loading operations.

Each loop track will be capable of holding one unit train; in addition, the automated loading racks will be capable of loading two trains with different crude types simultaneously.

Initial rail loading capacity will be approximately 80,000 b/d with expansion capability.

UK: Totalenergies Merges Its Upstream Business With NEO Next, Creating the Largest Independent Oil and Gas Producer in The UK
12.08.2025 - NEWS
December 08, 2025 [Totalenergies]- TotalEnergies has signed an agreement with NEO NEXT Energy Lim... Read More
Squadron Energy Chooses Reganosa to Operate and Maintain a New LNG Terminal in Australia
12.08.2025 - NEWS
December 08, 2025 [Squadron Energy]- After an international selection process, Reganosa Servicios... Read More
Air Products and Yara in Advanced Negotiations to Partner on Low-emission Ammonia Projects
12.08.2025 - NEWS
December 08, 2025 [Yara]- World-leading hydrogen supplier and global industrial gases company Air... Read More
Europe’s Soft Gas Prices Put the Squeeze on U.S. LNG Traders
12.08.2025 - NEWS
December 08, 2025 [Oil Price]- U.S. exports of liquefied natural gas have been on a record-breaki... Read More