Vinci, Sener to Build Another LNG Terminal for Germany
10.12.2022 By Ella Keskin - NEWS

October 12, 2022 [Global Construction Review] – French construction group Vinci has won a contract to build Germany’s second liquid natural gas (LNG) regasification terminal at Brunsbüttel on the mouth of the Elbe. The facility will allow imports of LNG to help replace Russian gas.

 

In July, regulators fast-tracked approval for Germany’s first LNG terminal at the North Sea port of Wilhelmshaven.

The Brunsbüttel project was first mooted in 2018, but progress was slowed by opposition from environmental groups. It is now being expedited by the German government as it scrambles to make up for the ending of gas supplies from Russia.

The work will be carried out as an engineer, procure and construct contract by Vinci subsidiary Cobra IS as part of a consortium that also includes Spanish engineer Sener.

When complete in 2026, the terminal will have two 165,000 cubic metre storage tanks and be able to produce some 10 billion cubic metres of natural gas a year.

Cobra IS and Sener have carried out similar projects in the past, including terminals at Sagunto and Bahía de Bizkaia in Spain, Gate in the Netherlands, Dunkirk in France and Zeebrugge in Belgium.

 


Pro Trial: Access 11,340 Tank Terminal and Production Facilities

11,340 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

COMMODITIES 2026: Oil storage expands globally as energy security, trading drive demand
01.11.2026 - NEWS
January 08, 2026 [ Spglobal ]- Storing oil is a growing industry as governments worldwide seek t... Read More
US oil refiners win, Chinese rivals lose in Trump’s Venezuela strike
01.11.2026 - NEWS
January 4, 2026 [ Reuters ]- The U.S. military’s ouster of Venezuelan President Nicolás Madu... Read More
Rebuilding Venezuela’s Oil Supply Chain for Global Markets
01.11.2026 - NEWS
January 05, 2026 [ Supplychaindigital ]- Trump’s push to rebuild Venezuela’s shattered oil s... Read More
Giant Canadian Green Hydrogen Project Shelved as Developer Shifts Focus to Domestic Power Exports
01.09.2026 - NEWS
January 09, 2026 [Fuel Cells Works]- World Energy GH2 has shelved its 1.2GW green hydrogen and ... Read More