More Stainless Steel Tanks for Rubis in Rotterdam
03.17.2011 - NEWS

March 17, 2011 [RUBIS Terminal] - Today, the first piles have been driven into the ground for the expansion of the Rubis Terminal in Rotterdam Botlek. 


In total 4 stainless steel tanks of 2,500 m³ each will be built. This new capacity is expected to be put into operation in December 2011.

Including this new capacity, the total storage capacity of the Rubis terminal will be increased to just over 120,000 m³ (of which 20,000 m³ stainless steel). Preparations are underway for a further expansion of the terminal to 182,200 m³.

EQT Announces $3.5 Billion Midstream Joint Venture with Blackstone Credit & Insurance
11.26.2024 - NEWS
November 26, 2024 [Blackstone]- EQT Corporation announced today that it has entered into a defini... Read More
Exclusive: Trump Prepares Wide-Ranging Energy Plan to Boost Gas Exports, Oil Drilling, Sources Say
11.26.2024 - NEWS
November 26, 2024 [Reuters]- Donald Trump’s transition team is putting together a wide-rang... Read More
TOPSOE is Selected Technology Provider by Indian Frontrunner in Green Ammonia, HYGENCO
11.26.2024 - NEWS
November 26, 2024 [Topsoe]- Topsoe, a global leader in carbon emission reduction technologies, ha... Read More
Malaysia Plans to Produce Sustainable Jet Fuel in 2027
11.26.2024 - NEWS
November 26, 2024 [Reuters]- Malaysia plans to start producing sustainable aviation fuel (SAF) i... Read More