Baltic Oil Raises £0.95m for Optimisation Project in Danish Terminal
05.23.2012 - NEWS

May 23, 2012 [Stock Market Wire] - Baltic Oil Terminals has raised £0.95m to progress its fuel oil optimisation project at its refined product terminal in Aabenraa, Denmark


The implementation of the project involves a re-engineering of the present pumping and hydraulic configuration at the terminal, through the replacement of the existing centrifugal pumps with modern and efficient screw pumps manufactured by Leistritz Pumpen GmbH in Germany.

At the same time, the pumping flow lines for the loading of vessels will be reconfigured to allow a step-up in the flow rates when loading vessels and significantly increasing the potential throughput of the Dan-Balt Tank Lager A/S Terminal.

The plan has a total budget of €1.2m and implementation is expected to be completed by the end of this year, whilst ensuring that present capacity remains unaffected by the modifications and allowing continuity of operations for the rest of 2012.

UAE State Oil Group ADNOC Sets Up International Investment Arm XRG
11.28.2024 - NEWS
November 28, 2024 [Reuters]- United Arab Emirates state oil group ADNOC on Wednesday announced th... Read More
Jordan Signs MoU with Chinese Firm for Green Hydrogen Project
11.28.2024 - NEWS
November 28, 2024 [Chem Analyst]- Jordan has taken another significant step towards its renewable... Read More
Chile Issues Enviro Permit for 10-MW Green Hydrogen Project
11.28.2024 - NEWS
November 28, 2024 [Renewables Now]- Chilean liquefied natural gas terminal operator GNL Quintero ... Read More
Cheniere Gets FERC OK for Corpus Christi LNG
11.28.2024 - NEWS
November 28, 2024 [Marine Link]- Federal regulators on Wednesday gave Corpus Christi Liquefaction... Read More