EET Fuels Appoints Wood for FEED for Hydrogen Fuel Switching Project
08.28.2024 By Tank Terminals - NEWS

August 28, 2024 [Tank Storage]- EET Fuels has progressed to the front-end engineering design (FEED) stage of its Hydrogen Fuel Switching project, appointing Wood for the EPC. Wood will coordinate final designs of the fuel system that will feed into the company’s hydrogen-ready crude distiller furnace. Wood will also re-design the core infrastructure and control systems to enable the efficient and safe combustion of hydrogen.

 

Hydrogen will be provided by EET Hydrogen, the company’s co-located Track One low carbon hydrogen production company.

Completion of FEED will enable EET Fuels to take final investment decision (FID) on the hydrogen fuel switching project next year.

The project will enable fuel switching to assets like EET Fuels’ hydrogen-ready crude distiller furnace. This is the first of its kind installed in any UK refinery and is capable of running on 100% hydrogen or a fuel-gas mix. Once the furnace is running on hydrogen from EET Hydrogen’s production plant, it will reduce emissions at the Stanlow Refinery by 0.2 million tonnes per year.

Once hydrogen is available from EET Hydrogen, this will enable the fuel switching of all fired-heaters on site.

The progression of this project demonstrates the company’s strong momentum towards achieving its target of reducing CO2 emissions at the Stanlow Refinery by 95% by 2030.

Deepak Maheshwari, CEO, EET Fuels, says: ‘We have groundbreaking plans for EET Fuels in the UK with the Stanlow Refinery at its heart. Hydrogen Fuel Switching is an integral part of these plans, and conducting the FEED alongside a great partner in Wood will allow us to confidently move forward to final investment decision. We remain on track to become the world’s first low carbon process refinery, providing security of fuel supply to the UK, as well as building and maintaining employment in the UK’s industrial heartlands.’

Martin Simmonite, senior vice president for UK Operations at Wood, adds: ‘We are delighted to be working on this decarbonisation project with EET Fuels, providing critical infrastructure that is fundamental to the energy transition and UK energy security.’

 

Free Trial: Access 13,300 Tank Terminal and Production Facilities

13,300 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

The Board of Max Terminals NV Approved the Investment for the Third and Final Phase of Max Terminals
09.19.2024 - NEWS
September 19, 2024 [Linkedin]- On September 12th, 2024, the Board of Max Terminals NV, a GTS comp... Read More
AMG and RWE Sign Deal for 250,000 Tonnes of Green Ammonia Supply
09.19.2024 - NEWS
September 19, 2024 [Manufacturing Today India]- AMG and RWE Supply & Trading have inked a Mem... Read More
Jordan Green Ammonia LLC Signs Land Use Agreements to Advance Green Energy Initiative
09.19.2024 - NEWS
September 19, 2024 [SolarQuarter]- Jordan Green Ammonia LLC (JGA), a prominent player in the rene... Read More
German State Gas Company Seeks Expansion Before Privatization
09.19.2024 - NEWS
September 19, 2024 [Oil Price]- Securing Energy for Europe, or SEFE, is trying to build a stronge... Read More