March 18, 2015 [Interfax] - PetroChina Jiangsu LNG has successfully lifted the roof of a 200,000 cubic metre LNG storage tank at the Jiangsu LNG terminal.
The tank forms part of the second phase of the Jiangsu project, which is under construction, and which will expand the terminal’s receiving capacity from 3.5 mtpa to 6.5 mtpa.