Additional Land for Novorossiysk Fuel Oil Terminal
05.30.2010 - NEWS
May 26, 2010 [NCSP ] - The Novorossiysk Commercial Sea Port Group (LSE: NCSP, RTS and MICEX: NMTP) Wednesday announced the acquisition of additional land plots for construction of the fuel oil terminal with 4 million tons per year capacity.

On May 21 the North-Caucasus Rail Road, a branch of OAO Russian Railways, and Novorossiysk Fuel Oil Terminal LLC, project operator 50% owned by PJSC NCSP, signed the agreement of transfer of rights to sub-tenancy for land plots with total area of 10.62 hectares located within the cargo yard of the Novorossiysk train station. Through this agreement Novorossiysk Fuel Oil Terminal LLC acquired the rights of usage and ownership of the land plots for deploying and operating the fuel oil terminal for the term of over 40 years.

Commenting on the signature on the agreement, PJSC NCSP Chairman of the Board Alexander Ponomarenko said: «Construction of the fuel oil terminal with 4 million tons capacity is one of the top priority projects for NCSP Group. In April this year we have signed the general contract and started land development works to prepare for construction. As of today Novorossiysk Fuel Oil Terminal LLC is in possession of sufficient land to deploy all elements of the new terminal’s infrastructure. The general contractor starts the ground-work cycle on major construction sites in the nearest future, which allows us to say that this massive project has entered into active investment phase».

Total investments in the project are estimated at 5 billion rubles, to be finances on a par basis by the Novorossiysk Fuel Oil Terminal LLC and the other founding partner. To facilitate loading of oil products from the terminal to tanker ships PJSC NCSP is reconstructing and modernizing liquid cargo berths at Pier #4.

Fuel oil terminal project envisages the construction of a tank farm with 82 000 cubic meters capacity, two railway discharge galleries for 60 and 48 tank cars, as well as technological pipelines and other units of infrastructure. Implementation of state of the art technologies for rail-to-tank and tank-to-ship transshipment and storage of fuel oil precludes any possibility of the oil’s watering and guarantees the highest level of environmental and industrial safety.

Wildcat Petroleum Enters MOU for South Sudan Assets
09.18.2024 - NEWS
September 18, 2024 [Oil & Gas Journal]- Wildcat Petroleum plc has entered a memorandum of und... Read More
Brazilian Biodiesel Production Expected to Grow by 18% in 2024
09.18.2024 - NEWS
September 18, 2024 [Biodiesel Magazine]- Brazilian biodiesel production is expected to increase 1... Read More
TotalEnergies Signs 10-Year LNG Supply Deal with Turkey’s Botas
09.18.2024 - NEWS
September 18, 2024 [Offshore Engineer]- Turkish state energy company Botas has signed a 10-year a... Read More
Maire's Nexchem Wins Two Contracts in Azerbaijan
09.18.2024 - NEWS
September 18, 2024 [Market Screener]- Maire Tecnimont Spa announced Tuesday that Nextchem, throug... Read More