Germany Builds Up LNG Import Terminals
08.03.2023 By Tank Terminals - NEWS

August 3, 2023 [Market Screener]- The EU Commission has approved a 40 million euro ($43.9 million) support measure for the land-based liquefied natural gas (LNG) terminal at Germany’s Brunsbuettel on the North Sea, citing its contribution to the security and diversification of supply.

 

Germany’s quest to build up LNG import capacity has intensified as it seeks to end reliance on Russian pipeline gas after Russia invaded Ukraine last year.

Pending the provision of fixed terminals, it is using floating storage and reception units (FSRUs) to help replace piped Russian gas supply.

Three FSRUs are working at Wilhelmshaven, Brunsbuettel and Lubmin after Germany arranged their charter and onshore connections in record time. Wilhelmshaven, Mukran and Stade are due to add more ships for the 2023/24 winter.

Industry and the government are also building up terminal capacity in anticipation of increased use of hydrogen, which when produced using renewable energy can help the transition to a lower carbon economy.

MUKRAN

Deutsche ReGas has sub-chartered a second FSRU from Transgas Power, with regasification capacity of 7.5 billion cubic metres (bcm), in a fresh step towards building up a new terminal at Mukran in the Baltic Sea.

LNG from Mukran is meant to flow to onshore grids via the nearby port of Lubmin from next winter. The project has triggered some local opposition.

WILHELMSHAVEN

Utility Uniper launched Germany’s first FSRU operations last December at the deep-water port on the North Sea.

It plans to add a land-based ammonia reception terminal and cracker in the second half of this decade. Ammonia is sometimes used as a carrier for hydrogen, whose low density otherwise makes its transportation over long distances complicated.

Tree Energy Solutions (TES) will operate a second FSRU from later in 2023 for five years, and plans to eventually convert the operations to clean gases.

LUBMIN

The FSRU Neptune, chartered by Deutsche ReGas, began receiving LNG at Lubmin early this year. The gas is delivered to another storage vessel, the Seapeak Hispania, and shuttled to Lubmin in a set-up taking account of shallow water.

ReGas holds long-term supply deals with France’s TotalEnergies and trading group MET.

The government wants the Neptune to move to Mukran, allowing the Seapeak Hispania to depart, and joining a second FSRU there, the Transgas Power. ReGas is tendering for LNG supplies to Mukran.

However, gas grid company Gascade needs to link Mukran via Lubmin to the mainland gas grids, making it hard to narrow down the likely start date of the project more closely than to the three months from December to February next year.

BRUNSBUETTEL

The Brunsbuettel FSRU, operated by RWE’s trading arm on the North Sea coast, became operational in mid-April.

It is the forerunner of a land-based LNG facility, now in receipt of a parcel of approved state support, that could start operations at the end of 2026, when an adjacent ammonia terminal could also start up. State bank KfW, Gasunie and RWE are stakeholders and Shell has committed itself to sizeable purchases.

The total costs for the land-based terminal are 1.3 billion euros.

STADE

The inland port on the river Elbe in January started work on a landing pier for an FSRU, to be ready in the winter of 2023/24. Designated vessel Transgas Force is now moored at Bremerhaven port to be fixed up for the purpose.

Project firm Hanseatic Energy Hub (HEH) also plans a land-based terminal where it has allocated regasification capacity that could be operational in 2027, including volumes for state-controlled Sefe and utility EnBW.

It has begun sounding out the market to determine whether the longer-term plans should be based largely on ammonia to be reconverted into clean hydrogen. It has identified a construction consortium.

HEH is backed by gas network company Fluxys, investment firm Partners Group, logistics group Buss and chemicals company Dow.

EnBW, which is also a buyer at Wilhelmshaven and Brunsbuettel, said it would double annual purchases to 6 bcm. ($1 = 0.9116 euros) (Reporting by Vera Eckert; Editing by Barbara Lewis and Jan Harvey)

Pro Trial: Access 12,600 Tank Terminal and Production Facilities

12,600 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

ArcelorMittal Poland Plans to Build a Hydrogen Production Plant in Krakow
11.22.2024 - NEWS
November 22, 2024 [Gmk Center]- An investment of more than PLN 100 million will provide hydrogen ... Read More
Clean Hydrogen Works Awards McDermott FEED Contract for Ascension Clean Energy (ACE) Project
11.22.2024 - NEWS
November 22, 2024 [Mcdermott]- Clean Hydrogen Works (CHW) and McDermott announce that CHW has awa... Read More
MOL Group Signed Cooperation Agreement with KazMunayGas
11.22.2024 - NEWS
November 22, 2024 [World Pipelines]- MOL Group and Kazakhstani national oil company KazMunayGas (... Read More
Dialog's 1Q profit grows 14%, driven by midstream tank storage business and big opex drop
11.22.2024 - NEWS
November 22, 2024 [The Edge Malaysia]- Dialog Group Bhd’s net profit in the first quarter e... Read More