Rotterdam LNG Throughput Up 73.8% In January-September
11.14.2022 By TankTerminals.com - NEWS

November 14, 2022 [LNGPrime] – LNG throughput in the Dutch port of Rotterdam rose 73.8 percent in the January-September period of this year on the back of high gas prices and as European countries look to reduce reliance on Russian gas.

 

The port, home to the Gate LNG import terminal, said that total LNG throughput reached 8.62 million tonnes in the nine-month period, compared to 4.96 million tonnes in the year before.

LNG throughput hit 5.41 million tonnes in the January-June period of this year, meaning that third-quarter throughput volumes reached about 3.21 million tonnes.

Incoming LNG volumes rose 89.9 percent in January-September to 8.50 million tonnes, while outgoing volumes dropped 75.3 percent to 120,000 tonnes, according to the Rotterdam port’s report.

“Much more LNG is supplied from the United States and other countries to replace Russian natural gas, which previously was piped to Northwestern Europe,” the port said.

Gate expansion

The Gate LNG terminal in the Rotterdam, owned by Gasunie and Vopak, recently received a permit to add the fourth tank and boost regasification capacity up to 20 Bcm per year.

Gate, owned by Gasunie and Vopak, has a capacity of 12 bcm or 8.8 mtpa of LNG, three LNG storage tanks with a capacity of 540,000 cbm, and three truck loading bays.

Following modifications, investments, and successful tests, Gate managed to add 4 bcm of capacity on an interruptible basis.

The LNG terminal operator also launched a non-binding open season to gauge market interest in an additional 4 Bcm per year of regasification capacity.

Besides Gate, Gasunie recently launched the first FSRU-based facility in the Netherlands with a capacity of 8 Bcm per year.

EemsEnergyTerminal, which consists of two chartered FSRUs, started delivering regasified LNG to the Dutch grid in mid-September.

Shell booked 4 bcm while Czech firm ČEZ took 3 bcm of the new terminal’s total capacity. France’s Engie secured the remaining 1 bcm of capacity.

Shell also has capacity rights at Gate, along with OMV, Glencore, and Uniper.

Pro Trial: Access 10,390 Tank Terminal and Production Facilities

10,390 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Port of Newcastle Completes Feed Studies for Green Hydrogen Project
12.05.2025 - NEWS
December 05, 2025 [Renewables Now]- Port of Newcastle has completed front-end engineering design ... Read More
CHS, Energy Partners Opening New Rail Terminal in Montana
12.05.2025 - NEWS
December 05, 2025 [LPGas Magazine]- When the temperatures drop each winter, Montana propane marke... Read More
BPGIC Begins Planning for Fujairah’s First Euro 5-Grade Gasoline Refinery
12.05.2025 - NEWS
December 05, 2025 [Global Flow Control]- Brooge Petroleum and Gas Investment Company (BPGIC), a s... Read More
Var Energi Makes Oil Discovery Near Arctic Field in Norway
12.05.2025 - NEWS
December 05, 2025 [Oil Price]- Var Energi confirmed on Thursday an oil discovery very close to ... Read More