Shell Halts Oil Output At Three Gulf Of Mexico Platforms
08.19.2022 By Ella Keskin - NEWS

August 19, 2022 [ Oil Price ] – Shell has halted production at three of its deepwater platforms in the Gulf of Mexico, Shell said in a statement to Reuters on Thursday.

 

Shell has halted production at its Mars, Ursa, and Olympus platforms, which combined can produce 410,000 barrels of Mars sour crude oil per day, after a leak shut in the Mars and Amberjack Pipelines that connect to the platforms. Shell has not provided a timetable for restart, although the company said it was evaluating “alternative flow paths” to bring the oil to shore through other pipeline routes.

“Shell is coordinating with local authorities and mobilizing personnel and equipment to assess the situation,” Shell said in a statement.

The leak was detected at the Fourchon booster station, which increases the pressure and the flow of crude on its way to the Clovelly Dome Storage Terminal in LOOP. The Clovelly Dome terminal stores crude oil in underground salt caverns before heading to a refinery. The terminal is capable of holding 40 million barrels.

The United States is already releasing between 800,000 and 1 million barrels of crude oil per day from its Strategic Petroleum Reserves in an attempt to alleviate the tight market and bring down prices. Crude oil inventories in the United States are 5% below the five-year average, with crude oil production in the United States failing to return to pre-Covid levels.

Current crude oil production in the United States is at 12.2 million barrels per day, compared to the pre-Covid peak of 13.1 million bpd reached in March 2020.

 


Pro Trial: Access 11,340 Tank Terminal and Production Facilities

11,340 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Heikki Malinen Appointed as the President and CEO of Neste
05.03.2024 - NEWS
May 03, 2024 [Petrol Plaza]- Neste Corporation’s Board of Directors has appointed Heikki Maline... Read More
Belgian Port Plans to Build €250m Hydrogen and Ammonia Export Terminal in Namibia
05.03.2024 - NEWS
May 03, 2024 [Esquare]- The Port of Antwerp-Bruges plans to build a €250 million ($267 million)... Read More
European Commission Grants €720 Million to Renewable Hydrogen Projects
05.03.2024 - NEWS
May 03, 2024 [Offshore Energy]- European Commission has awarded nearly €720 million to seven re... Read More
Rotterdam LNG Bunkering Volumes Jump in Q1
05.03.2024 - NEWS
May 03, 2024 [LNG Prime]- LNG bunkering volumes in the Dutch port of Rotterdam reached a record l... Read More