Turkiye Plans to Expand LNG Gasification Capacity with New FSRUs
02.04.2026 By Tank Terminals - NEWS

February 04, 2026 [Daily Sabah]- Turkiye plans to double the capacity at its floating storage and regasification unit (FSRU) in the southern province of Hatay and build an additional terminal, Energy and Natural Resources Minister Alparslan Bayraktar announced on Sunday.

 

Apart from the FSRU facility in Hatay, the authorities plan to build another one on the Mediterranean coast, according to Bayraktar.

“We are now in a process of planning and working on a new FSRU with a regasification capacity of 28 million cubic metres (mcm) to be installed next to the existing BOTAS Dortyol FSRU in Hatay. We will double the capacity here,” Bayraktar said in Hatay, according to a readout of his remarks sent by the ministry.

Recalling that natural gas arriving in Turkiye in liquefied form via ships needs to be regasified before it can be used in the system, he noted that the Ertuğrul Gazi FSRU fulfills this function.

Moreover, stating that Ertugrul Gazi converts approximately 28 mcm of liquefied natural gas back into gas phase daily, Bayraktar said that with 28 million cubic meters per day, the gas needed by Hatay, Osmaniye, and approximately 17 surrounding provinces during the winter months is being provided from this facility, this ship.

Turkiye’s first floating storage and regasification unit, Ertugrul Gazi, is seen as a key player in strengthening Turkiye’s gas supply security.

Again in the Mediterranean, Turkiye is also planning to build a new FSRU facility between Gazipaşa and Anamur to strengthen the energy infrastructure, the minister said.

“With our second FSRU project, which will double the capacity in Dörtyol, and the new facility we will bring online in the Mediterranean, we will increase our daily gasification capacity to 200 million cubic meters. In this way, we will be able to procure more than half of our needs as LNG (liquified natural gas),” he said in a post on X.

 

TankTerminals.com is a market research platform with not only manager-level contact details but also logistical, operational, infrastructural and shipping data of more than +10,100 tank terminals and +6,200 production facilities worldwide.

 

Access data. Decide better. See how.

Exclusive: Vitol Moves to Open Mexico Fuel Terminal Years After Bribery Scandal, Document Shows
05.21.2026 - NEWS
May 21, 2026 [Reuters]- Vitol, one of the world’s biggest commodities traders, has held tal... Read More
Bangchak Group Launches Thailand’s First Commercial SAF Production A Major Step Towards the Future of Low Carbon Energy for Domestic and International Markets
05.21.2026 - NEWS
May 21, 2026 [Bangchak Group]- Bangchak Group has launched Thailand’s first commercial producti... Read More
New UAE Oil Pipeline Bypassing Hormuz 50% Complete Ahead of 2027 Start
05.21.2026 - NEWS
May 21, 2026 [Reuters]- The UAE’s new crude pipeline bypassing the Strait of Hormuz is abou... Read More
Cheniere’s Corpus Christi Stage 3 Train 6 Produces First LNG
05.21.2026 - NEWS
May 21, 2026 [Pipeline & Gas Journal]- Cheniere Energy said on May 19 that Train 6 of the Cor... Read More