Tidewater Midstream Plans to Build Canada’s First Renewable Diesel Facility in PG
07.19.2021 By Ricardo Perez - NEWS

July 19, 2021 [myprincegeorgenow] – A new renewable diesel facility could be coming to Prince George

 

It would be Canada’s first and would be created by Tidewater Midstream at the PG Refinery.

“Tidewater has chosen to develop the proposed facility integrated with the existing Prince George Refinery in order to minimize the environmental footprint by taking advantage of existing logistics and utility infrastructure as well as the skilled workforce at the refinery,” said Tom Hems, Tidewater’s Director of Refinery Economics and Investor Relations.

Tidewater says in an investor presentation that demand for renewable diesel right now is 8.4 billion gallons per year, and expects that to grow to 18 billion gallons per year by 2040.

Another presentation notes that vegetable oils, animals fats, and used cooking oil are some of the resources they’d be using to create the diesel.

“The project will convert 100% renewable feedstock into high-quality renewable diesel that is fully compatible with conventional diesel engines. The renewable diesel will have a carbon intensity approximately 80 – 90% lower than conventional diesel and will be primarily supplied in Prince George and Central BC, leading to significantly reduced GHG emissions from diesel consumption in our region,” said Hems.

“The finished renewable diesel will also be suitable for cold weather operation in Northern BC, which is not the case with lower quality biodiesel,” he added.

The BC government is looking to create more renewable diesel production in the province, aiming for 650 million liters by 2030.

Tidewater predicts that this project would cover about 25% of that demand.

The additions to the PG Refinery to make this project reality would include a gas-fired reformer heater, two gas-fired process heaters, one boiler, six storage tanks, and an emergency flare stack.

If the project gets the ok from City Council it’s slated to be running by 2023.

Click Here to Access Today a 7,000 Tank Terminal Database With a Pro Trial

7,000 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Angel CCS JV and Yara Partner for Carbon Capture and Storage Study
04.19.2024 - NEWS
April 19, 2024 [Pipeline & Gas Journal]- The Angel CCS Joint Venture will collaborate with Ya... Read More
Kinder Morgan Meets Profit Estimates, Sees New Demand from AI Operations
04.19.2024 - NEWS
April 19, 2024 [Reuters]- Pipeline and terminal operator Kinder Morgan (KMI.N), opens new tab on ... Read More
Cepsa and Evos Join up for Green Methanol Storage in Spain and the Netherlands
04.19.2024 - NEWS
April 19, 2024 [Storage Terminals Magazine]- Spanish energy company Cepsa has forged an agreement... Read More
Linde to Increase Green Hydrogen Production in Brazil
04.19.2024 - NEWS
April 19, 2024 [Linde]- Linde (Nasdaq: LIN) announced today its subsidiary White Martins will bui... Read More