TES & Ramboll Explore CO2 Infrastructure for Green Energy Hub
06.16.2025 By Tank Terminals - NEWS

June 16, 2025 [Tank Storage]- Tree Energy Solutions (TES) and Ramboll have completed a joint engineering study for a CO₂ export terminal at TES’s Green Energy Hub in Wilhelmshaven, Germany.

 

The study concludes this month and sets the stage for the next phase of pre-FEED. The collaboration assessed technical alternatives for CO₂ imports by rail and exports by ship. The terminal is designed to support carbon capture and storage (CCS) by enabling the transport of CO₂ to offshore storage sites. Ramboll’s analysis covered a CO₂ receiving rail terminal and CO₂ export terminal, including rail-based offloading, buffer storage, boil-off gas (BOG) handling, and transfer to a jetty for ship-based export. The terminal will link to Germany’s national rail system, the European high pressure gas grid, the H2ercules hydrogen backbone, and the future CO₂ transport network. In its first phase, the facility is expected to handle 3–5 million tonnes of CO₂ per year, with plans to scale up to 10 million tons. Once the onshore CO₂ pipeline network reaches Wilhelmshaven, capacity can be expanded further.

TES’s onshore terminal in Wilhelmshaven will facilitate LNG and e-NG imports, with an initial capacity of 15bcm as well as CO₂ exports, local power generation and hydrogen production. Strategically located at Germany’s only deep-water port, the hub connects to key infrastructure and plays a central role in Europe’s energy security and energy transition.

 

TankTerminals.com is a market research platform with logistical, operational, infrastructural and shipping data that includes contact details of more than +9,600 tank terminals and +6,000 production facilities worldwide.

Access data. Decide better. See how.

Europe
NW-Europe
Giant Canadian Green Hydrogen Project Shelved as Developer Shifts Focus to Domestic Power Exports
01.09.2026 - NEWS
January 09, 2026 [Fuel Cells Works]- World Energy GH2 has shelved its 1.2GW green hydrogen and ... Read More
Start-Up of the Steam Cracker at BASF’s Verbund Site in Zhanjiang, China
01.09.2026 - NEWS
January 09, 2026 [BASF]- BASF has successfully commissioned the steam cracker at its newly built ... Read More
ADNOC Announces Final Investment Decision for the SARB Deep Gas Development
01.09.2026 - NEWS
January 09, 2026 [ADNOC]- ADNOC today announced the Final Investment Decision (FID) for the SARB ... Read More
Equinor Awards $10 Billion Contracts to Maintain Norway’s Oil and Gas Output
01.09.2026 - NEWS
January 09, 2026 [Oil Price]- Equinor has awarded $10 billion worth of contracts to suppliers as ... Read More