Shell Signs Deal to Receive LNG at Future German Brunsbuettel Terminal
03.28.2022 By Ricardo Perez - NEWS

March 26, 2022 [Reuters] – Shell (SHEL.L) and German LNG Terminal GmbH on Wednesday said Shell has committed to booking a substantial part of a yet-to-be built landing terminal for liquefied natural gas (LNG) at the North Sea port of Brunsbuettel, as companies strive to lower their dependency on Russian pipeline gas.

 

A joint statement said the two parties have signed a memorandum of understanding on Shell’s import and distribution through the Gasunie-operated terminal (GSUNI.UL)> that would have an annual capacity of 8 billion cubic metres (bcm) and should start operating in 2026 at the latest.

“The signed MoU with Shell as well as the noticeable increase in interest from the market demonstrates the importance of the import terminal in Brunsbuettel,” said Michael Kleemiss, Managing Director of German LNG Terminal.

Gasunie, utility RWE (RWEG.DE) and German state lender KfW (KFW.UL) banded together earlier this month to redraw the terminal’s shareholder structure, combining finance requirements and operational expertise.

They said they will aim to allow the terminal to function on gas first, but strive for a conversion to carbon-free hydrogen in the long term.

Germany has no LNG import terminals to date but in the wake of Russia’s invasion of Ukraine turned around its energy policy to try and replace east-west pipeline flows from Russia with other geographic sources and gas arrivals on board LNG ships.

Germany last year consumed 100 bcm of gas while importing 142 bcm due to its role as a distribution hub in continental Europe.

The LNG Terminal company previously was advanced by Gasunie with tank storage firm Vopak (VOPA.AS) and Marquard & Bahls’ Oiltanking, but those two exited in the course of the new deal with KfW.

RWE last Friday spelled out future plans for its engagement at the LNG site which after its LNG function will expressly stretch to hydrogen or hydrogen derivatives such as ammonia.

Pro Trial: Access 10,390 Tank Terminal and Production Facilities
10,390 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Angel CCS JV and Yara Partner for Carbon Capture and Storage Study
04.19.2024 - NEWS
April 19, 2024 [Pipeline & Gas Journal]- The Angel CCS Joint Venture will collaborate with Ya... Read More
Kinder Morgan Meets Profit Estimates, Sees New Demand from AI Operations
04.19.2024 - NEWS
April 19, 2024 [Reuters]- Pipeline and terminal operator Kinder Morgan (KMI.N), opens new tab on ... Read More
Cepsa and Evos Join up for Green Methanol Storage in Spain and the Netherlands
04.19.2024 - NEWS
April 19, 2024 [Storage Terminals Magazine]- Spanish energy company Cepsa has forged an agreement... Read More
Linde to Increase Green Hydrogen Production in Brazil
04.19.2024 - NEWS
April 19, 2024 [Linde]- Linde (Nasdaq: LIN) announced today its subsidiary White Martins will bui... Read More