Seaspan Signs MoU with AES for LNG Bunkering in Panama
10.06.2023 By Tank Terminals - NEWS

October 6, 2023[Seatrade Maritime News]- Canada-based Seaspan and energy company AES Corp have signed a Memorandum of Understanding (MoU) to collaborate on the development of the LNG Bunkering business.

 

In a significant development for the regional Liquefied Natural Gas (LNG) industry, AES and shipowner Seaspan partner to drive sustainable energy solutions in the maritime industry.  The collaboration is primarily aimed at offering LNG bunkering services to shipping vessels transiting the Panama Canal and exploring similar opportunities in regional markets.

AES is working on the expansion of its Costa Norte LNG terminal in Colon, Panama, which will include new LNG refuelling infrastructure on LNG carriers, through a new ship-loading facility that is scheduled to start operations in November 2023. Under the new MOU, the terminal will be able to supply LNG for refuelling, either directly for bunkering or regional distribution.

In a significant development for the regional Liquefied Natural Gas (LNG) industry, AES and shipowner Seaspan partner to drive sustainable energy solutions in the maritime industry.  The collaboration is primarily aimed at offering LNG bunkering services to shipping vessels transiting the Panama Canal and exploring similar opportunities in regional markets.

AES is working on the expansion of its Costa Norte LNG terminal in Colon, Panama, which will include new LNG refuelling infrastructure on LNG carriers, through a new ship-loading facility that is scheduled to start operations in November 2023. Under the new MOU, the terminal will be able to supply LNG for refuelling, either directly for bunkering or regional distribution

The two companies said Seaspan will provide its 7,600-cbm LNG bunker vessels (LNGBVs) to the new terminal, which will allow them to offer LNG marine fuelling from the second half of 2024.

The facility will also be able to offer temporary storage and reloading using Costa Norte’s 180,000-cbm storage tank, which will allow different market operators to store their LNG temporarily and withdraw it on demand.

“The collaboration with our shipowner partner and the innovations at our Costa Norte Terminal position us as leaders in driving sustainable, efficient and affordable solutions to meet the growing demands of the market,” said AES Panama president Miguel Bolinga.

 

Pro Trial: Access 12,600 Tank Terminal and Production Facilities

12,600 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

CB&I Awarded Contract by TotalEnergies and OQ for Full Containment Liquefied Natural Gas Tank in Oman
05.09.2024 - NEWS
May 09, 2024 [PR Newswire]- CB&I, a wholly owned unrestricted subsidiary of McDermott, has be... Read More
H-TEC SYSTEMS and Bilfinger Join Forces for Green Hydrogen Projects in Europe
05.09.2024 - NEWS
May 09, 2024 [Chem Analyst]- H-TEC SYSTEMS, an innovative leader in PEM electrolysis technology, ... Read More
Chinese Group to Build $1.5bn Green Aviation Fuel Plant in Northern China Based on Wind-Powered Hydrogen
05.09.2024 - NEWS
May 09, 2024 [Hydrogen Insight]- Chinese company Shanxi International Energy Group has signed an ... Read More
Sempra Says ECA LNG Export Project More Than 80 Percent Complete
05.09.2024 - NEWS
May 09, 2024 [LNG Prime]- US LNG exporter Sempra said that construction of the first phase of its... Read More