Savage Constructs Terminal for Crude Transport in US
08.30.2012 - NEWS

August 30, 2012 [Energy Business Review] - Savage has completed the construction of Trenton terminal situated near Trenton, in North Dakota, US, to transport crude oil from the Williston Basin and Bakken Shale to refinery markets.


The terminal is in direct connection with the main track line of BNSF Railway, which serves the Savage Bakken Petroleum Services Hub and enables it to deliver crude to the markets of east, west, and gulf coast.

The Trenton terminal will provide inbound gathering access through truck receiving stations, pipeline connections and crude oil tankage and outbound delivery via a double loop track capable of holding two 118 car unit trains.

Savage business development senior vice president Nathan Savage said the company recognized the need for crude transportation services in the Williston Basin and constructed o Trenton terminal.

“The terminal adds crude by rail transportation to the area’s existing pipeline capacity, to maximize the options producers have to get crude to refineries,” Savage added.

“We are excited to provide a unique open terminal that will meet a critical need in the oil industry.”

BNSF group industrial products vice president Dave Garin said, “Rail provides a more flexible, long-term, economical option to ship crude oil to destination markets throughout the East, West and Gulf coasts and along the Mississippi River.”

The Trenton terminal can be further developed to accommodate the receiving and handling of the growing demand of oilfield material and crude oil.

Canada's Cenovus Posts Surge in Profit as MEG Acquisition Spurs Record Output
05.06.2026 - NEWS
May 06, 2026 [Reuters]- Canadian oil and gas producer Cenovus Energy posted a ​rise in first-qu... Read More
Equinor Shares Fall as Cash Flow Miss Outweighs Record Output, Soaring Prices
05.06.2026 - NEWS
May 06, 2026 [Reuters]- Equinor missed quarterly cash-flow forecasts on Wednesday, hitting its sh... Read More
TA'ZIZ Secures $28.5 B in Agreements to Expand UAE's Chemicals Infrastructure
05.06.2026 - NEWS
May 06, 2026 [Hydrocarbon Processing]- TA’ZIZ announced at the Make it in the Emirates forum th... Read More
U.S.-Canada Oil Pipeline Nears Go-Ahead as Shippers Lock In Volumes
05.06.2026 - NEWS
May 06, 2026 [Oil Price]- A long-delayed push to move more Canadian crude into the United States ... Read More