Savage Constructs Terminal for Crude Transport in US
08.30.2012 - NEWS

August 30, 2012 [Energy Business Review] - Savage has completed the construction of Trenton terminal situated near Trenton, in North Dakota, US, to transport crude oil from the Williston Basin and Bakken Shale to refinery markets.


The terminal is in direct connection with the main track line of BNSF Railway, which serves the Savage Bakken Petroleum Services Hub and enables it to deliver crude to the markets of east, west, and gulf coast.

The Trenton terminal will provide inbound gathering access through truck receiving stations, pipeline connections and crude oil tankage and outbound delivery via a double loop track capable of holding two 118 car unit trains.

Savage business development senior vice president Nathan Savage said the company recognized the need for crude transportation services in the Williston Basin and constructed o Trenton terminal.

“The terminal adds crude by rail transportation to the area’s existing pipeline capacity, to maximize the options producers have to get crude to refineries,” Savage added.

“We are excited to provide a unique open terminal that will meet a critical need in the oil industry.”

BNSF group industrial products vice president Dave Garin said, “Rail provides a more flexible, long-term, economical option to ship crude oil to destination markets throughout the East, West and Gulf coasts and along the Mississippi River.”

The Trenton terminal can be further developed to accommodate the receiving and handling of the growing demand of oilfield material and crude oil.

Shell Withdraws from Argentina LNG Project with YPF
12.15.2025 - NEWS
December 15, 2025 [Pipeline & Gas Journal]- Shell has opted out of participating in the next ... Read More
DL Chemical Proposes Shutting Yeochun NCC's No. 1 Plant Under Restructuring
12.15.2025 - NEWS
December 15, 2025 [Reuters]- South Korean petrochemical company DL Chemical said on Monday that Y... Read More
Chlorum Solutions Acquires Iowa Chlor-Alkali Facility from Cargill
12.15.2025 - NEWS
December 15, 2025 [Chemical Engineering]- Chlorum Solutions USA LLC (Chicago) announced that it ... Read More
Gascade Completes 400km German Hydrogen Pipeline Conversion
12.12.2025 - NEWS
December 12, 2025 [H2 View]- Gascade Gastransport has completed the conversion of 400km of natura... Read More