Russian President Commissions Kaliningrad LNG Terminal
01.14.2019 - NEWS

January 14, 2019 [Marine Link] - Russian President Vladimir Putin inaugurated a liquefied natural gas (LNG) import terminal that will serve as a back-up gas supply solution for the Russian enclave of Kaliningrad on the Baltic Sea.  The facility includes floating storage regasification unit (FSRU) in Baltic Sea enclave.


Gazprom CEO Alexei Miller said: “The floating storage regasification platform is currently moored at the receiving terminal; that platform will convert LNG into gas to pump into the underground facility and to supply to consumers in Kaliningrad Region.”

Putin said that the Kaliningrad region is no longer dependent on transit gas supplies. According to him, commissioning a gas receiving terminal into a storage facility with a floating regasification unit would nullify the transit risks for the Kaliningrad region.

The terminal, built in the Baltic Sea, consists of a pier protected by a breakwater, where a floating storage regasification unit, the Marshal Vasilevsky tanker, is moored.

The vessel converts LNG delivered by sea back to natural gas, which is then distributed to consumers or pumped into the Kaliningrad underground gas storage facility, a sealed natural gas reservoir buried deep in rock salt sediment.

The first such project carried out by Gazprom in Russia, this alternative gas supply option for Kaliningrad Region is to increase the region’s energy security, given its unique location.

According to TASS, Kaliningrad underground gas storage (UGS) is the first in the country sealed natural reservoir created in deep sediments of rock salt. It is expected that the alternative variant of gas supply to the Kaliningrad region, launched with the participation of the president, using LNG delivered by sea, will increase the energy security of the region, taking into account its location.

—————————-

TankTerminals.com – Research, Market and Expand Your Presence within the Tank Storage Industry. Learn more.

Heikki Malinen Appointed as the President and CEO of Neste
05.03.2024 - NEWS
May 03, 2024 [Petrol Plaza]- Neste Corporation’s Board of Directors has appointed Heikki Maline... Read More
Belgian Port Plans to Build €250m Hydrogen and Ammonia Export Terminal in Namibia
05.03.2024 - NEWS
May 03, 2024 [Esquare]- The Port of Antwerp-Bruges plans to build a €250 million ($267 million)... Read More
European Commission Grants €720 Million to Renewable Hydrogen Projects
05.03.2024 - NEWS
May 03, 2024 [Offshore Energy]- European Commission has awarded nearly €720 million to seven re... Read More
Rotterdam LNG Bunkering Volumes Jump in Q1
05.03.2024 - NEWS
May 03, 2024 [LNG Prime]- LNG bunkering volumes in the Dutch port of Rotterdam reached a record l... Read More