Poland's Gaz-System to Get $593 Million Loan for Country's Floating LNG Terminal
06.19.2025 By Tank Terminals - NEWS

June 19, 2025 [Reuters]- Polish pipeline operator Gaz-System will receive a 2.2 billion zlotys ($593 million) loan from state bank BGK to finance the onshore segment of Poland’s first floating storage and regasification unit near Gdansk, BGK said on Wednesday.

 

The loan, sourced from European Union funds, will finance construction of a 250-km (155-mile) pipeline that will connect the terminal to the core of Poland’s gas network, BGK Deputy President Marta Pustula told reporters. The loan will be repaid over 25 years, Pustula added.

The floating storage and regasification unit will be based in the Bay of Gdansk and is expected to be completed in 2028.

In January, Gaz-System completed the expansion of its LNG terminal in Świnoujście, increasing its regasification capacity to 8.3 billion cubic metres, which corresponds to nearly 50% of the annual gas demand of domestic consumers.

 

TankTerminals.com is a market research platform with logistical, operational, infrastructural and shipping data that includes contact details of more than +9,600 tank terminals and +6,000 production facilities worldwide.

Access data. Decide better. See how.

Uniper will Launch the Sale of its 20% Stake in Gas Pipeline OPAL
12.16.2025 - NEWS
December 16, 2025 [Uniper]- Uniper will launch the sale of its 20% stake in the regulated OPAL ga... Read More
Spain's Solarig to Invest Over $400 Million in Biomethane Plants in Poland
12.16.2025 - NEWS
December 16, 2025 [Reuters]- Spanish renewable developer Solarig will invest over 1.5 billion zlo... Read More
LNG Supply Expands Faster Than China’s Demand Growth
12.16.2025 - NEWS
December 16, 2025 [Oil Price]- China’s LNG demand is disappointing in 2025 for a second year in... Read More
Tanker Fleet Crunch Forecasts Strong Rates Through Early 2026
12.16.2025 - NEWS
December 16, 2025 [Oil Price]- Oil tanker rates are set to stay elevated in early 2026 as crude s... Read More