Nustar Expands Marine Loading Capacity for Crude At Corpus Christi Terminal
02.14.2014 - NEWS

February 14, 2014 [OPIS] - NuStar Energy LP said on Thursday that the company has its first ship loading crude oil at its new private marine loading dock at its North Beach Terminal in Corpus Christi, Texas, after completing the project several months ahead of schedule.


Originally scheduled to be completed in the second quarter of this year, NuStar expedited the project in order to meet strong customer interest in using the dock to transport shipments of Eagle Ford crude oil by water.

With this new dock, NuStar now has three loading docks in the Port of Corpus Christi, and can load crude oil onto ships simultaneously on all three docks.

NuStar also completed major additions and upgrades to the terminal’s pump systems. With all of these upgrades, the North Beach terminal’s marine loading capacity was more than tripled to 400,000 b/d.

“This additional capacity enables us to handle all of the new volumes associated with our ongoing expansion efforts in our South Texas crude oil pipeline system, as well as additional volumes shipped on our pipeline systems to Corpus Christi,” said NuStar President and CEO Brad Barron.

The new dock project includes a series of 30-inch and 12-inch pipelines that move the crude oil from incoming pipelines or tanks within the terminal to the new dock, a state-of-the-art metering system, vapor control system, and a dock structure with three loading arms. The dock system is designed to load Panamax-class vessels (which carry between 350,000 and 500,000 bbl) at rates up to 30,000 barrels per hour. And the entire structure is supported by 73 concrete
piles, each measuring approximately 120 feet, and each of these piles was driven about 70 feet into the bottom of the ship channel.

Shell Withdraws from Argentina LNG Project with YPF
12.15.2025 - NEWS
December 15, 2025 [Pipeline & Gas Journal]- Shell has opted out of participating in the next ... Read More
DL Chemical Proposes Shutting Yeochun NCC's No. 1 Plant Under Restructuring
12.15.2025 - NEWS
December 15, 2025 [Reuters]- South Korean petrochemical company DL Chemical said on Monday that Y... Read More
Chlorum Solutions Acquires Iowa Chlor-Alkali Facility from Cargill
12.15.2025 - NEWS
December 15, 2025 [Chemical Engineering]- Chlorum Solutions USA LLC (Chicago) announced that it ... Read More
Gascade Completes 400km German Hydrogen Pipeline Conversion
12.12.2025 - NEWS
December 12, 2025 [H2 View]- Gascade Gastransport has completed the conversion of 400km of natura... Read More