New Tank Farm for Ust-Luga
07.05.2021 By Ricardo Perez - NEWS

July 5, 2021 [Sea News] – A new tank far is to be built on the territory of the condensed gas terminal in the port of Ust-Luga in the Russian Baltic.

 

The Main Department of State Expertize has approved the project documentation and engineering studies for the first stage of the project.

The project envisages building four steel tanks with a capacity of 40,000 cubic meters to store condensed gas as well as light and heavy naphtha made from it.

Other infrastructure to be developed includes a cable overpass, a pumping station for condensed gas and products, drainage tanks and other engineering structures and communications.

Additional roads connected to the road accesses to the port will be built, and the existing engineering network is to be modernized.

According to SeaNews PORTSTAT analytical online service, during January-May 2021 the terminal operated by Novatek Ust-Luga handled 2.87 mn tons, down 1.1% year-on-year.

Click Here to Access Today a 6,750 Tank Terminal Database With a Pro Trial

6,750 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Enovos Announces FID on Luxembourg Green Hydrogen Project
06.15.2026 - NEWS
June 15, 2026 [Renewables Now]- Enovos announced that a final investment decision (FID) has been ... Read More
KPC Approves Egypt Gas Project, Output Set for Q4
06.15.2026 - NEWS
June 15, 2026 [Zawya]- Kuwait Petroleum Corporation (KPC) has approved an investment in a gas exp... Read More
Shell Pauses $3 Billion Share Buyback Ahead of ARC Acquisition Vote
06.15.2026 - NEWS
June 15, 2026 [Reuters]- Shell said ‌on Friday it was pausing its $3 billion share buyback prog... Read More
LyondellBasell to Shut Remaining PP Output at Brindisi
06.15.2026 - NEWS
June 15, 2026 [Argus Media]- Petrochemical producer LyondellBasell said it plans to close its rem... Read More