New Tank Farm for Ust-Luga
07.05.2021 By Ricardo Perez - NEWS

July 5, 2021 [Sea News] – A new tank far is to be built on the territory of the condensed gas terminal in the port of Ust-Luga in the Russian Baltic.

 

The Main Department of State Expertize has approved the project documentation and engineering studies for the first stage of the project.

The project envisages building four steel tanks with a capacity of 40,000 cubic meters to store condensed gas as well as light and heavy naphtha made from it.

Other infrastructure to be developed includes a cable overpass, a pumping station for condensed gas and products, drainage tanks and other engineering structures and communications.

Additional roads connected to the road accesses to the port will be built, and the existing engineering network is to be modernized.

According to SeaNews PORTSTAT analytical online service, during January-May 2021 the terminal operated by Novatek Ust-Luga handled 2.87 mn tons, down 1.1% year-on-year.

Click Here to Access Today a 6,750 Tank Terminal Database With a Pro Trial

6,750 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Tepsa Advances Fifth Port in Spain
07.21.2026 - NEWS
July 20, 2026 [Tank Storage Magazine]- Tespa has been awarded a c.5-hectare concession, with envi... Read More
Panama Acquires Petroterminal de Panama After Buying Remaining Shares
07.20.2026 - NEWS
July 20, 2026 [Tank Storage Magazine]- Panama’s government has acquired Petroterminal de Panama... Read More
Vopak stock reflects steady energy storage role in global trade
07.17.2026 - BLOGS
10 July 2026 [ Ad-hoc-news ]- Royal Vopak’s stock performance highlights the stable, infrastruc... Read More
Rhine Freight Market: Falling Water Levels Push Rates Steadily Higher
07.16.2026 - NEWS
July 16, 2026 [Insights Global]- The Rhine barge freight market moved from a quiet Monday into a ... Read More