New Tank Farm for Ust-Luga
07.05.2021 By Ricardo Perez - NEWS

July 5, 2021 [Sea News] – A new tank far is to be built on the territory of the condensed gas terminal in the port of Ust-Luga in the Russian Baltic.

 

The Main Department of State Expertize has approved the project documentation and engineering studies for the first stage of the project.

The project envisages building four steel tanks with a capacity of 40,000 cubic meters to store condensed gas as well as light and heavy naphtha made from it.

Other infrastructure to be developed includes a cable overpass, a pumping station for condensed gas and products, drainage tanks and other engineering structures and communications.

Additional roads connected to the road accesses to the port will be built, and the existing engineering network is to be modernized.

According to SeaNews PORTSTAT analytical online service, during January-May 2021 the terminal operated by Novatek Ust-Luga handled 2.87 mn tons, down 1.1% year-on-year.

Click Here to Access Today a 6,750 Tank Terminal Database With a Pro Trial

6,750 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Vitol Set to Supply New Colombia LNG Project, Bloomberg News Reports
12.05.2025 - NEWS
December 05, 2025 [Reuters]- Energy trader Vitol is expected to supply Colombia’s new liquefied... Read More
Chevron's Gorgon LNG Project Secures $2 Billion Investment Nod
12.05.2025 - NEWS
December 05, 2025 [Reuters]- The Australian unit of U.S. oil giant Chevron said on Friday that th... Read More
India's ONGC Moves Closer to Keeping 20% Stake in Russia's Sakhalin-1 Project, Sources Say
12.05.2025 - NEWS
December 05, 2025 [Reuters]- India’s Oil and Natural Gas Corp will pay into Russia’s ... Read More
Hawkins, Inc. Expands in Texas with Acquisition of Redbird Chemical, Inc.
12.04.2025 - NEWS
December 04, 2025 [Globe Newswire]- Hawkins, Inc. (Nasdaq: HWKN), a leading water treatment and s... Read More