New Tank Farm for Ust-Luga
07.05.2021 By Ricardo Perez - NEWS

July 5, 2021 [Sea News] – A new tank far is to be built on the territory of the condensed gas terminal in the port of Ust-Luga in the Russian Baltic.

 

The Main Department of State Expertize has approved the project documentation and engineering studies for the first stage of the project.

The project envisages building four steel tanks with a capacity of 40,000 cubic meters to store condensed gas as well as light and heavy naphtha made from it.

Other infrastructure to be developed includes a cable overpass, a pumping station for condensed gas and products, drainage tanks and other engineering structures and communications.

Additional roads connected to the road accesses to the port will be built, and the existing engineering network is to be modernized.

According to SeaNews PORTSTAT analytical online service, during January-May 2021 the terminal operated by Novatek Ust-Luga handled 2.87 mn tons, down 1.1% year-on-year.

Click Here to Access Today a 6,750 Tank Terminal Database With a Pro Trial

6,750 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Quatra Expands UK Footprint with Strategic Acquisition of Lifecycle Oils
12.15.2025 - NEWS
December 15, 2025 [Biofuels International]- Quatra, one of Europe’s leading specialists in the ... Read More
KBR Awarded Green Ammonia Project by IGNIS in Spain
12.15.2025 - NEWS
December 15, 2025 [Globe Newswire]- KBR (NYSE: KBR) announced today that it has been awarded a te... Read More
GreenGo Energy and SELECT ENERGY Announce Strategic Partnership for Landmark Green Ammonia Project in Mauritania
12.15.2025 - NEWS
December 15, 2025 [GreenGo Energy]- GreenGo Energy A/S (“GreenGo”), a Danish renewable energy... Read More
Egypt, Qatar's Al Mana Holding Sign $200 Million Sustainable Aviation Fuel Deal
12.15.2025 - NEWS
December 15, 2025 [Reuters]- Egypt signed a contract with Qatar’s Al Mana Holding for a fir... Read More