New Tank Farm for Ust-Luga
07.05.2021 By Ricardo Perez - NEWS

July 5, 2021 [Sea News] – A new tank far is to be built on the territory of the condensed gas terminal in the port of Ust-Luga in the Russian Baltic.

 

The Main Department of State Expertize has approved the project documentation and engineering studies for the first stage of the project.

The project envisages building four steel tanks with a capacity of 40,000 cubic meters to store condensed gas as well as light and heavy naphtha made from it.

Other infrastructure to be developed includes a cable overpass, a pumping station for condensed gas and products, drainage tanks and other engineering structures and communications.

Additional roads connected to the road accesses to the port will be built, and the existing engineering network is to be modernized.

According to SeaNews PORTSTAT analytical online service, during January-May 2021 the terminal operated by Novatek Ust-Luga handled 2.87 mn tons, down 1.1% year-on-year.

Click Here to Access Today a 6,750 Tank Terminal Database With a Pro Trial

6,750 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Moeve Approves FID for Andalusian Green Hydrogen Valley
03.02.2026 - NEWS
March 02, 2026 [Tank Storage Magazine]- Moeve has approved the Final Investment Decision (FID) of... Read More
Trafigura, Venture Global Sign Five‑Year US LNG supply deal
03.02.2026 - NEWS
March 02, 2026 [Reuters]- Venture Global has agreed to sell about 0.5 million tonnes per annum (M... Read More
Japex to Exit Vietnam LNG Terminal Project
03.02.2026 - NEWS
March 02, 2026 [Offshore Technology]- Japan Petroleum Exploration (Japex) has announced its decis... Read More
Mexico's Pemex Narrows Losses in Last Quarter of 2025
03.02.2026 - NEWS
March 02, 2026 [Reuters]- Mexican state energy company Pemex narrowed losses sharply in the fourt... Read More