Higher GDV from Pengerang's Terminal Expansion: AmResearch
09.05.2013 - NEWS

September 05, 2013 [Mysinchew] - AmResearch, which has maintained a 'buy' call on Dialog Group, believes the expansion of Pengerang Independent Deepwater Petroleum Terminal site acreage can result in higher gross development value (GDV) for the project, if the safety buffer zone is no longer needed.


As at end-August, 160ha had been reclaimed which were 80 per cent of the targeted 2200ha, it said.

“If the zone allocated between the Pengerang tank terminal and the residential is no longer needed due to the proximity of refinery and petrochemical integrated development (RAPID), we understand that the entire Pengerang tank terminal area could reach 280 ha (40 per cent larger),” it said in a research note today.

AmResearch said the entire 200ha Pengerang tank terminal development included a RM5 billion oil storage facility” and a RM4 billion liquefied natural gas regassification and storage facility.

“Hence, the site acreage expansion can result in higher GDV for the project,” it said.

Aramco and PETRONAS Announce Transfer of Full Ownership of PRefChem to PETRONAS
05.25.2026 - NEWS
May 25, 2026 [Zawya]- Aramco, one of the world’s leading integrated energy and chemicals compan... Read More
Turkey's BOTAS Signs Deal with Italy's Edison for Natural Gas And LNG Cooperation
05.25.2026 - NEWS
May 22, 2026 [Reuters]- Turkey’s state energy company BOTAS said on Friday ​that it has s... Read More
Energy Infrastructure Damaged in Missile Attack on Russia's Belgorod Region, Local Authorities Say
05.25.2026 - NEWS
May 25, 2026 [Reuters]- One man was killed and another injured while energy infrastructure ​was... Read More
Mercuria and Motor Oil Hellas Sign Memorandum of Understanding to Cooperate on LNG Supply through Dioriga Gas FSRU
05.25.2026 - NEWS
May 25, 2026 [PRNewswire]- Mercuria Energy (“Mercuria”) and Motor Oil Hellas (“... Read More