Higher GDV from Pengerang's Terminal Expansion: AmResearch
09.05.2013 - NEWS

September 05, 2013 [Mysinchew] - AmResearch, which has maintained a 'buy' call on Dialog Group, believes the expansion of Pengerang Independent Deepwater Petroleum Terminal site acreage can result in higher gross development value (GDV) for the project, if the safety buffer zone is no longer needed.


As at end-August, 160ha had been reclaimed which were 80 per cent of the targeted 2200ha, it said.

“If the zone allocated between the Pengerang tank terminal and the residential is no longer needed due to the proximity of refinery and petrochemical integrated development (RAPID), we understand that the entire Pengerang tank terminal area could reach 280 ha (40 per cent larger),” it said in a research note today.

AmResearch said the entire 200ha Pengerang tank terminal development included a RM5 billion oil storage facility” and a RM4 billion liquefied natural gas regassification and storage facility.

“Hence, the site acreage expansion can result in higher GDV for the project,” it said.

Koncar, Siemens Energy to Build 22.5 Mln Euro Hydrogen Plant for INA
12.09.2025 - NEWS
December 09, 2025 [SeeNews]- Croatian electrical equipment manufacturer Koncar said on Friday it ... Read More
Cstar Sets January 2026 Start for Kribi Refinery Construction
12.09.2025 - NEWS
December 09, 2025 [Business in Cameroon]- Cstar has announced that an engineering mission will ar... Read More
UAE to Hike LNG Exports to Meet Soaring Global Demand
12.09.2025 - NEWS
December 09, 2025 [Oil Price]- The United Arab Emirates is growing its LNG exports to meet surgin... Read More
Russia Could Boost LPG Exports to China by 40% in 2026, Consultancy Says
12.09.2025 - NEWS
December 09, 2025 [Reuters]- Russia may increase liquefied petroleum gas supplies to China by 40%... Read More