Gunvor Teams up with VARO to Build Sustainable Aviation Fuel Facility in Rotterdam
08.02.2024 By Tank Terminals - NEWS

August 02, 2024 [Reuters]- Global energy trader Gunvor Group on Thursday said it will join VARO Energy to build a large scale sustainable aviation fuel manufacturing facility at the Gunvor Energy Rotterdam site through a proposed joint venture.

 

Under the agreement, VARO and Gunvor will equally share the costs and risks to develop the plant until the final investment decision. Following a joint final investment decision and regulatory approvals, they will form a project company equally owned by both, Gunvor said.

Since VARO’s intial announcement on the project in September last year, there has been significant progress and the Front-End Engineering Design phase is expected to be completed in the last quarter this year, the energy trader said.

The manufacturing facility in Rotterdam, with capacity of 350 kt per annum, aims to produce enough sustainable aviation fuel to meet up to 7% of the European Union’s requirement by 2030, Gunvor said.

The facility is designed to process various feedstocks and produce either sustainable aviation fuel or hydrotreated vegetable oil, allowing flexibility based on market conditions and regulatory requirements, it said.

Located at Gunvor Energy Rotterdam’s brownfield site, the facility will benefit from existing infrastructure, including transport, pipelines, utilities, port facilities, and proximity to key Northern European markets, Gunvor said.

Gunvor operates a 75,000 barrel-per-day oil refinery at Rotterdam.

 

TankTerminals.com is a market research platform with operational, infrastructural and contact details of more than +8,500 tank terminals and +5,000 production facilities worldwide.


Access data. Decide better. See how.

A total of 45 Varo Energy tank terminals and production facilities are listed in TankTerminals.com, and therefore ready to be analyzed.

We list here 8 of those facilities with a direct link to access their data.

Giant Canadian Green Hydrogen Project Shelved as Developer Shifts Focus to Domestic Power Exports
01.09.2026 - NEWS
January 09, 2026 [Fuel Cells Works]- World Energy GH2 has shelved its 1.2GW green hydrogen and ... Read More
Start-Up of the Steam Cracker at BASF’s Verbund Site in Zhanjiang, China
01.09.2026 - NEWS
January 09, 2026 [BASF]- BASF has successfully commissioned the steam cracker at its newly built ... Read More
ADNOC Announces Final Investment Decision for the SARB Deep Gas Development
01.09.2026 - NEWS
January 09, 2026 [ADNOC]- ADNOC today announced the Final Investment Decision (FID) for the SARB ... Read More
Equinor Awards $10 Billion Contracts to Maintain Norway’s Oil and Gas Output
01.09.2026 - NEWS
January 09, 2026 [Oil Price]- Equinor has awarded $10 billion worth of contracts to suppliers as ... Read More