Germany's TES Accelerates Plan for Gas Import Terminal
04.03.2022 By Ricardo Perez - NEWS

April 3, 2022 [Reuters] – Germany’s Tree Energy Solutions (TES), backed by Belgian firm AtlasInvest, said on Wednesday it would accelerate plans for a gas import terminal to be built at the northern German port of Wilhelmshaven in partnership with E.ON (EONGn.DE).

 

It said it was bringing the project forward by about two years because of an energy crisis, which has been fuelled by Russia’s invasion of Ukraine.

The terminal, to be built by 2025, would be used to import liquefied natural gas (LNG) as a transitional energy source while Germany and the rest of Europe seek to cut reliance on Russian supplies amid a shift towards renewable power.

It said it was bringing the project forward by about two years because of an energy crisis, which has been fuelled by Russia’s invasion of Ukraine.

The terminal, to be built by 2025, would be used to import liquefied natural gas (LNG) as a transitional energy source while Germany and the rest of Europe seek to cut reliance on Russian supplies amid a shift towards renewable power.

The infrastructure would gradually be adjusted so that by 2027 it would handle imports of methane, which would be made using green techniques rather than fossil fuels.

By 2027, it could handle volumes of 25 terawatt hours (TWh), TES Chief Operational Officer Otto Waterlander said, rising to 10 times that by 2045 with investment of 25 billion euros ($28 billion).

Green methane can be produced from CO2 when it is combined with hydrogen made using renewable power. The methane can be used as a green gas itself or converted back into hydrogen, with any CO2 recaptured, as TES plans to do, in a closed-loop system.

TES, backed by Switzerland’s Varo and other energy investors, aims to make methane by using mainly solar power in Gulf, North Africa, North America and Mexico.

The company will develop a terminal with storage tanks, ship berths and a power plant. German energy firm E.ON (EONGn.DE) will be a commercial partner in helping build a supply chain.

Several initiatives to import LNG and clean gases have gathered momentum in recent weeks as Germany accelerates efforts to shift away from Russian natural gas supplies and speed up its green transition.

Pro Trial: Access 10,390 Tank Terminal and Production Facilities

10,390 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Giant Canadian Green Hydrogen Project Shelved as Developer Shifts Focus to Domestic Power Exports
01.09.2026 - NEWS
January 09, 2026 [Fuel Cells Works]- World Energy GH2 has shelved its 1.2GW green hydrogen and ... Read More
Start-Up of the Steam Cracker at BASF’s Verbund Site in Zhanjiang, China
01.09.2026 - NEWS
January 09, 2026 [BASF]- BASF has successfully commissioned the steam cracker at its newly built ... Read More
ADNOC Announces Final Investment Decision for the SARB Deep Gas Development
01.09.2026 - NEWS
January 09, 2026 [ADNOC]- ADNOC today announced the Final Investment Decision (FID) for the SARB ... Read More
Equinor Awards $10 Billion Contracts to Maintain Norway’s Oil and Gas Output
01.09.2026 - NEWS
January 09, 2026 [Oil Price]- Equinor has awarded $10 billion worth of contracts to suppliers as ... Read More