Germany Welcomes First LNG Carrier At New Wilhelmshaven Terminal
01.08.2023 By TankTerminals.com - NEWS

January 8, 2022 [OilPrice.com] – The cargo was loaded in Calcasieu Pass at the liquefaction facility of LNG supplier Venture Global on December 19, 2022.

 

Germany saw the share of Russian gas in its gas mix drop to some 20% last year from 55% in 2021.

Germany welcomed on Tuesday the first tanker carrying liquefied natural gas (LNG) at the newly opened LNG import terminal at Wilhelmshaven, with the cargo arriving from the Calcasieu Pass export facility in the United States. 

The LNG ship Maria Energy, owned by Tsakos Energy Navigation, was loaded in Calcasieu Pass at the liquefaction facility of LNG supplier Venture Global on December 19, 2022, the operator of the Wilhelmshaven import terminal, Uniper, said today.

The Maria Energy tanker was fully loaded with around 170,000 cubic meters of LNG, or 97,147,000 cubic meters of natural gas, which is enough to supply around 50,000 German households with energy for one year, Uniper added.

The LNG cargo delivered on board Maria Energy is part of the commissioning process at the Wilhelmshaven terminal. Commercial operations of the terminal are expected to start in the middle of January 2023.

“The use of LNG as a reliable energy source is crucial for the Security of Supply for Germany and Europe. We are committed to contribute our part by bringing more LNG to the European market and especially Germany via the Wilhelmshaven and Brunsbüttel Regas Terminals,” said Niek den Hollander, Uniper CCO.

Germany inaugurated its first floating LNG import terminal at Wilhelmshaven a week before Christmas as Europe’s biggest economy looks to cut reliance on Russian gas and as Moscow cut supply via the Nord Stream pipeline in early September.

Other LNG terminals are also planned in Germany, which was rather reluctant to commit to LNG import facilities before the Russian invasion of Ukraine. After the war started, Germany, the Netherlands, Finland, and countries in southern Europe hastened to bring forward or dust off plans to build floating LNG terminals to have enough regasification capacity to replace the lost volumes of Russian pipeline gas.

Germany saw the share of Russian gas in its gas mix drop to some 20% last year from 55% in 2021, according to data from energy lobby group BDEW cited by Bloomberg last month.

Pro Trial: Access 11,340 Tank Terminal and Production Facilities

11,340 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Angel CCS JV and Yara Partner for Carbon Capture and Storage Study
04.19.2024 - NEWS
April 19, 2024 [Pipeline & Gas Journal]- The Angel CCS Joint Venture will collaborate with Ya... Read More
Kinder Morgan Meets Profit Estimates, Sees New Demand from AI Operations
04.19.2024 - NEWS
April 19, 2024 [Reuters]- Pipeline and terminal operator Kinder Morgan (KMI.N), opens new tab on ... Read More
Cepsa and Evos Join up for Green Methanol Storage in Spain and the Netherlands
04.19.2024 - NEWS
April 19, 2024 [Storage Terminals Magazine]- Spanish energy company Cepsa has forged an agreement... Read More
Linde to Increase Green Hydrogen Production in Brazil
04.19.2024 - NEWS
April 19, 2024 [Linde]- Linde (Nasdaq: LIN) announced today its subsidiary White Martins will bui... Read More