Dalian to Complete Construction of Oil Terminal and Jetty on Changxing Island in Late 2011
08.09.2011 - NEWS

August 5, 2011 [C1 Energy] - Dalian in Northeast China’s Liaoning province is expected to complete construction of a 300,000-DWT oil jetty in Changxing Island at the end of 2011, according to a source with Dalian Port Oil Terminal Co (transliteration).


“The oil jetty came under construction in March 2010, with construction scheduled to last about one year and a half,” said the source, who is an engineering director of this project.
This jetty is scheduled to be equipped with 4.2 mln m3 of tanks in the future, said the source.
Dalian Port Oil Terminal also plans to begin construction of a 100,000-DWT jetty in the first half of 2012, according to market sources.
C1 reported previously that Brightoil was constructing a large oil tank farm in Changxing Island, together with a 300,000-DWT jetty.
Dalian Port Oil Terminal is a subsidiary of Dalian Port Group, engaged in the shipping and storage of petroleum products and liquid chemical products

Aramco and PETRONAS Announce Transfer of Full Ownership of PRefChem to PETRONAS
05.25.2026 - NEWS
May 25, 2026 [Zawya]- Aramco, one of the world’s leading integrated energy and chemicals compan... Read More
Turkey's BOTAS Signs Deal with Italy's Edison for Natural Gas And LNG Cooperation
05.25.2026 - NEWS
May 22, 2026 [Reuters]- Turkey’s state energy company BOTAS said on Friday ​that it has s... Read More
Energy Infrastructure Damaged in Missile Attack on Russia's Belgorod Region, Local Authorities Say
05.25.2026 - NEWS
May 25, 2026 [Reuters]- One man was killed and another injured while energy infrastructure ​was... Read More
Mercuria and Motor Oil Hellas Sign Memorandum of Understanding to Cooperate on LNG Supply through Dioriga Gas FSRU
05.25.2026 - NEWS
May 25, 2026 [PRNewswire]- Mercuria Energy (“Mercuria”) and Motor Oil Hellas (“... Read More