Buckeye to Shut Eldorado Terminal Temporarily in Mach for Upgrading
02.15.2012 - NEWS

February 15, 2012 [OPIS] - Buckeye Pipeline said on Tuesday that it will shut its Eldorado Terminal along the Laurel Line for four consecutive days around March 22-23 for meter upgrade work.


Eldorado terminal is near Altoona, east of Pittsburgh. This shutdown will have an impact on the 081 distillate cycle, which will be delivered to the Eldorado area during that time period.

Without knowing the exact composition of the linefill at that particular time, Buckeye advises terminals/shippers to have a buffer of inventory available as the 072 gas cycle and 081 distillate cycle delivers in the Pittsburgh area.

Buckeye will open to Eldorado on the arrival of the 081 ULSD and deliver a volume that will supply the terminal for the four days of work.

ConocoPhillips Set to Sign Deal with Syria to Revive Gas Production, FT Reports
06.16.2026 - NEWS
June 16, 2026 [Reuters]- U.S. oil and gas producer ConocoPhillips is set ​to sign a contract wi... Read More
Stocks of Oil in US Strategic Petroleum Reserve Falls to Lowest Since 1983
06.16.2026 - NEWS
June 16, 2026 [Reuters]- Stocks of crude oil in the U.S. Strategic Petroleum Reserve fell to 340.... Read More
Angola's State Oil Firm Secures $2.65 Billion Financing from Foreign Lenders
06.16.2026 - NEWS
June 16, 2026 [Reuters]- Angola’s state oil company Sonangol has secured a $2.65 billion â€... Read More
India’s ONGC Considers Resuming Venezuela Oil Operations
06.16.2026 - NEWS
June 16, 2026 [Oil Price]- ONGC Videsh Ltd (OVL), the overseas unit of India’s state-owned Oil ... Read More