BP Trinidad and Tobago Announces Mento First Gas
05.29.2025 By Tank Terminals - NEWS

May 29, 2025 [Tank Storage]- BP Trinidad and Tobago’s (bpTT) Mento development has safely delivered first gas through connection of the initial discovery well. The drilling campaign for the remaining seven gross wells on the platform will now begin.

 

Mento is a 50/50 joint venture between EOG Resources Trinidad Ltd (EOG) and bpTT, with EOG as the operator. The development features a 12-slot, attended facility that is located in acreage jointly licensed by bpTT and EOG off Trinidad’s southeast coast.

Mento is one of bp’s 10 major projects expected to start up worldwide between 2025 and 2027 that bp announced earlier this year as part of its strategy to grow the upstream. Production from Mento will make a significant contribution towards the 250,000 barrels of oil equivalent per day (boed) combined peak net production expected from these 10 projects.

The Mento platform was built at the TOFCO fabrication yard, La Brea, Trinidad.

bpTT president David Campbell says: ‘I am proud to announce first gas from Mento with our partner EOG Resources Trinidad Ltd. For bpTT, this represents our second start up this year and it is tangible proof of the benefits of partnering with others to bring much needed gas into production. The bpTT/EOG partnership is progressing well as we continue to work on our next joint venture project Coconut.’

 

Free Trial: Access 13,300 Tank Terminal and Production Facilities

13,300 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

US LNG opportunities ‘lie beyond Permian basin’
12.07.2025 - NEWS
Dec 04, 2025 [ Gasworld ]- LNG project developers face a critical supply chain challenge that w... Read More
OTTCO affirms strategic role in driving Oman’s hydrogen goals
12.07.2025 - NEWS
December 5, 2025 – [Oman Observer] – Oman Tank Terminal Company (OTTCO), a subsidiar... Read More
Port of Newcastle Completes Feed Studies for Green Hydrogen Project
12.05.2025 - NEWS
December 05, 2025 [Renewables Now]- Port of Newcastle has completed front-end engineering design ... Read More
CHS, Energy Partners Opening New Rail Terminal in Montana
12.05.2025 - NEWS
December 05, 2025 [LPGas Magazine]- When the temperatures drop each winter, Montana propane marke... Read More