Both Nieuwe Waterweg Deepening and Botlek's Docks Expected to Bring Rotterdam an Extra 5-10M TPA
03.27.2018 - NEWS

March 27, 2018 [TankTerminals.com/Port of Rotterdam/NT] – This is estimated by Mr Edwin Hupkes, who is for the Port of Rotterdam responsible for the expansion of the Botlek area.


Today about 50 million tons per annum is being transferred in these docks. We expect that this will increase with 10 to 20% after the increase of the depth. The project requires an investment of 50 to 70 million Euro.

The excavation will take about half a year. The depth will be increased to 16.4 meters, about 1.5 meter more than today. In fact, this means that the Botlek area, which was built in the 50s and 60s, becomes accessible by neo-Panamax tankers and (liquid)bulk carriers with a draft of 15,0 metres. Additionally, after the increase of the draft, three tide dependent ships can enter and leave the area in one tide. That is limited to one ship nowadays.

The actual dredging is currently already underway and the entire job, including related work, is expected to be completed in the beginning of 2019.

—————————-

TankTerminals.com – Research, Market and Expand Your Presence within the Tank Storage Industry
Learn more.

Petronas and Japan's ENEOS Xplora Agree on 10% Stake in Malaysia LNG Plant
04.30.2026 - NEWS
April 30, 2026 [Reuters]- Malaysia’s state energy firm Petronas said it has signed definiti... Read More
Valero Energy Beats Profit Estimates on Strong Refining Performance
04.30.2026 - NEWS
April 30, 2026 [Reuters]- U.S. refiner Valero Energy surpassed Wall Street expectations for first... Read More
PetroChina's First-Quarter Profit Up on Growing Gas and Fuel Sales
04.30.2026 - NEWS
April 30, 2026 [Reuters]- PetroChina, Asia’s largest oil and gas producer, posted a 1.9% ri... Read More
BP Signs Agreement with Venezuela to Develop Offshore Gas Fields
04.30.2026 - NEWS
April 30, 2026 [Reuters]- BP will develop Venezuela’s Cocuina-Manakin gas field, on the mar... Read More