Baltic Oil Raises £0.95m for Optimisation Project in Danish Terminal
05.23.2012 - NEWS

May 23, 2012 [Stock Market Wire] - Baltic Oil Terminals has raised £0.95m to progress its fuel oil optimisation project at its refined product terminal in Aabenraa, Denmark


The implementation of the project involves a re-engineering of the present pumping and hydraulic configuration at the terminal, through the replacement of the existing centrifugal pumps with modern and efficient screw pumps manufactured by Leistritz Pumpen GmbH in Germany.

At the same time, the pumping flow lines for the loading of vessels will be reconfigured to allow a step-up in the flow rates when loading vessels and significantly increasing the potential throughput of the Dan-Balt Tank Lager A/S Terminal.

The plan has a total budget of €1.2m and implementation is expected to be completed by the end of this year, whilst ensuring that present capacity remains unaffected by the modifications and allowing continuity of operations for the rest of 2012.

BP Exits Bay du Nord Oil Project, Leaving Equinor as Sole Owner
07.06.2026 - NEWS
July 06, 2026 [Reuters]- BP has agreed to sell its stake in the Bay du Nord offshore oil project ... Read More
Glenfarne, BGN Sign HoA for LNG Supply from Texas LNG
07.06.2026 - NEWS
July 06, 2026 [Offshore Technology]- Glenfarne Global Commodities, the liquefied natural gas (LNG... Read More
UAE's ADNOC Launches Combined LNG Marketing and Trading Platform
07.06.2026 - NEWS
July 06, 2026 [Reuters]- UAE state oil giant ADNOC launched a new liquefied natural gas marketing... Read More
Oil and Gas Supply Chain Strategy: Why Energy Flows Are Now Strategic Infrastructure
07.06.2026 - NEWS
30 Jun 2026 [ Logisticsviewpoints ]- Oil and gas is commonly described in terms of commodities, ... Read More