Petrobras Canceled Bidding for Barracuda and Caratinga Platforms, Says Director
02.28.2025 By Tank Terminals - NEWS

February 28, 2025 [Reuters]- Petrobras has cancelled a tender for the chartering of an FPSO-type platform for the Barracuda and Caratinga fields, due to the project’s unfeasibility, said the company’s director of Engineering, Technology and Innovation, Renata Baruzzi, this Thursday.

 

Information about the possible cancellation was reported by Reuters last week, based on information from people close to the discussions.

Speaking to journalists on Thursday, Baruzzi did not provide details on what would be the impossibility.

Reuters reported that the only bid in the tender had been made by India’s Shapoorji Pallonji Energy, and the price was higher than expected by the state-owned oil company, according to two sources.

Petrobras understood that the economic model for the Barracuda and Caratinga project would not be viable with the result of the competitive process for contracting the platform, according to the director.

The director said that the company sees a “small” impact from the project cancellation, but commented that Petrobras could re-bid the platform under the BOT model, a contracting modality in which the contractor is responsible for the design, construction, assembly and operation of the asset for an initial period defined in the contract. Subsequently, the operation is transferred to the state-owned company.

The company initially expected to contract an FPSO (an acronym in English that identifies floating platforms with the capacity to produce, store and unload oil) for the project that would have the capacity to produce up to 100,000 barrels of oil per day (bpd) and process up to 6 million m3 of gas daily.

 

Free Trial: Access 13,300 Tank Terminal and Production Facilities

13,300 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Chevron to Supply Hungary with 2 Billion Cubic Metres of LNG, Minister Says
12.17.2025 - NEWS
December 17, 2025 [Reuters]- Hungary’s state-owned MVM group has signed a 5-year deal with ... Read More
Fortum and Kemi Partner to Develop 17-Hectare Hydrogen Project Site on Ajos Island
12.17.2025 - NEWS
December 17, 2025 [Fuel Cells Works]- Fortum and City of Kemi have agreed to develop a site locat... Read More
Vitol Deal Revives Uganda’s $4 Billion Refinery Ambitions
12.17.2025 - NEWS
December 17, 2025 [Oil Price]- Commodity trading major Vitol will provide $2 billion in loans for... Read More
Metafuels Awards McDermott FEED Contract for First Commercial e-SAF Plant in Rotterdam
12.17.2025 - NEWS
December 17, 2025 [Global-eFuels]- Metafuels, the Swiss aviation technology company, has awarded ... Read More