Chile Defense Ministry Greenlights Magallanes Maritime Ammonia Terminal
01.07.2025 By Tank Terminals - NEWS

January 07, 2025 [Bnamericas]- The armed forces department of Chile’s defense ministry granted a local ammonia project company the right to build and use maritime logistics infrastructure in southern Magallanes region.

 

Permission was awarded to Sociedad de Inversiones Albatros, a member of local hydrogen association H2 Chile.

Under the terms of the concession agreement, which expires June 2044, the company is authorized to build and operate, in Clarencia bay, a multi-buoy terminal, pipelines and a manifold station. One of the pipelines is 24-inches in diameter and associated with planned desalination of 9,916m3/y of seawater. Another is 18 inches in diameter and for the dispatch of ammonia to vessels.

Construction is estimated to take 29 months and associated surface area is 9,247m2. Infrastructure is geared to vessels of 200m in length and with 50,000 gross register tonnage, according to an extract of a decree published in the official gazette.

According to H2 Chile information, Albatros is partnering with Danish renewables investor CIP and global project developer Alfanar on an initiative called Llaquedona Green Hydrogen.

The feasibility-phase project, which will need an environmental license and multiple other permits, involves a wind-powered 800MW fleet of electrolyzers to produce ammonia for exportation.

Planned wind capacity is 1.16GW and hydrogen production 80,000t/y, according to information in the BNamericas project database.

Llaquedona is one of multiple hydrogen derivative projects planned for Chile. Publicly available details on many are limited.

Green hydrogen projects have begun entering the environmental review system in Chile and pickaxes could start swinging this half of the decade. Associated challenges include getting environmental licenses, driving down costs and securing offtakers.

Two projects under environmental review are planned for Magallanes: HNH Energy (green ammonia, 1.4GW wind, 1GW electrolysis) and Cabo Negro/Faro del Sur from HIF Global (e-fuels, 384MW wind, 230MW electrolysis).

 

Free Trial: Access 13,300 Tank Terminal and Production Facilities

13,300 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Uzbek State Oil and Gas Company Signs Deal With Cargill to Attract $3 Billion in Investments
12.05.2025 - NEWS
December 05, 2025 [Reuters]- A subsidiary of Uzbekistan’s state-run oil and gas company Uzbekne... Read More
Vitol Set to Supply New Colombia LNG Project, Bloomberg News Reports
12.05.2025 - NEWS
December 05, 2025 [Reuters]- Energy trader Vitol is expected to supply Colombia’s new liquefied... Read More
Chevron's Gorgon LNG Project Secures $2 Billion Investment Nod
12.05.2025 - NEWS
December 05, 2025 [Reuters]- The Australian unit of U.S. oil giant Chevron said on Friday that th... Read More
India's ONGC Moves Closer to Keeping 20% Stake in Russia's Sakhalin-1 Project, Sources Say
12.05.2025 - NEWS
December 05, 2025 [Reuters]- India’s Oil and Natural Gas Corp will pay into Russia’s ... Read More