Exxon Moves Beaumont, Texas, CDU Overhaul to June from August
11.16.2023 By Tank Terminals - NEWS

November 16, 2023 [Reuters]- Exxon Mobil (XOM.N) moved up the start date for a crude distillation unit (CDU) overhaul at its 619,024 barrel-per-day (bpd) Beaumont, Texas, refinery from August 2024 to June 2024, said people familiar with the company’s plans.

 

Exxon continues to plan to shut the 65,000-bpd diesel-producing hydrocracker in January for an overhaul, during which the 80,000-bpd reformer will also be shut for work, according to the sources.

Exxon spokesperson Lauren Kight declined to comment on Tuesday.

The 180,000-bpd Crude B CDU is scheduled to shut down for the overhaul in June, two months earlier than previously planned, the five sources said.

Crude B is one of three CDUs breaking down crude oil at the start of the refining process to produce feedstocks for all other units at the refinery, which is the nation’s second largest by capacity.

Crude B processes sour crude oil, a cheaper grade that requires processing for the higher levels of residual crude it produces compared with sweet crude.

While the CDU is shut, the 100,000-bpd Vacuum B vacuum distillation unit (VDU) will also be shut for work, the sources said. Production on the refinery’s 60,000-bpd coker will be cut back while Crude B shut.

Unlike CDUs, which operate at atmospheric pressure, VDUs operate at vacuum pressure to break down residual crude oil into feedstocks for other production units.

Cokers take residual crude from distillation units and break it down into motor fuel feedstocks or petroleum coke, which can be used as a coal substitute.

Hydrocrackers use a catalyst under high heat and pressure in the presence of hydrogen to convert gas oil into diesel and other motor fuels.

Reformers convert refining byproducts into octane-boosting components added to unfinished gasoline to make premium grades.

Pro Trial: Access 12,600 Tank Terminal and Production Facilities

12,600 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Gascade Completes 400km German Hydrogen Pipeline Conversion
12.12.2025 - NEWS
December 12, 2025 [H2 View]- Gascade Gastransport has completed the conversion of 400km of natura... Read More
Exclusive: Oman's OQ in Talks With Partners for Duqm Petrochem Project as Sabic Withdraws
12.12.2025 - NEWS
December 12, 2025 [Reuters]- Oman’s state energy group OQ is in talks with new potential pa... Read More
Suncor Energy Targets Major Production Boost in 2026
12.12.2025 - NEWS
December 12, 2025 [Oil Price]- Canada’s oil producer Suncor Energy expects to grow its upstream... Read More
Canada’s Cenovus Energy To Boost 2026 Oil Production
12.12.2025 - NEWS
December 12, 2025 [Oil Price]- Cenovus Energy expects its upstream production to rise by about 4%... Read More