First Third of Crude Oil Successfully Transferred from FSO Safer
08.02.2023 By Tank Terminals - NEWS

August 2, 2023 [The Meritime Executive]- The oil transfer from the derelict FSO Safer off the coast of Yemen is proceeding well according to updates from the United Nations and Boskalis.

 

The team from SMIT Salvage began the ship-to-ship transfer at the beginning of last week and they are now reporting that more than a third of the crude oil has been transferred without incident.

The pumping operation began on July 25 after nearly two months of on-site preparation. The replacement tanker Yemen was positioned alongside the FSO Safer and they began removing the approximately 1.4 million barrels of oil that has been stored on the vessel since 2015. News of the start of the transfer was widely hailed by countries across the region and around the world which have supported the project.

SMIT reports to pump the oil to the Yemen, hydraulic pumps are lowered into each tank on the FSO Safer. During the transfer operation, inert gas is supplied to keep the tank atmosphere at safe levels during the operation. This is begin done with a portable system because the gas system on the vessel had stopped functioning long ago with reports that the tanks had not been properly vented. This was one of the factors raising concern for the potential of a catastrophic explosion on the Safer.

The operation began with two of the central tanks of the Safer and within two days the UN was reporting that 223,000 barrels of oil had been safely removed. Over the weekend, they reported that the first phase of the transfer has been completed. On July 30, UN officials reported that 360,000 barrels, which represents a third of the oil stored on the Safer had been transferred to the Yemen.

Boskalis in its latest update confirmed that “the oil transfer is progressing well and will take two to three weeks.” Once all the pumpable oil has been removed from the Safer, a layer of thick oil will remain on the bottom of the tanks. This layer will be removed by a mobile spray tank cleaning machine, which will clean the inside of the tanks in an operation that is expected to take two to three weeks.

Two other phases include the installation of the mooring for the Yemen which will remain at the site as a replacement for the Safer. In addition, the Safer will be prepared for removal so that the vessel can be recycled before its decaying structure fails. UN officials had initially hoped to repair the Safer but later reported that the vessel was in an advanced stage of decay meaning that it was past repair and required replacement.

Pro Trial: Access 12,600 Tank Terminal and Production Facilities

12,600 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Pakistan, China Likely to Sign MoU on Petrochemical Refinery Next Month
05.18.2024 - NEWS
May 18, 2024 [Geo News]- During Prime Minister Shehbaz Sharif’s visit to Beijing in June, the g... Read More
Stena Oil’s New Terminal in Frederikshavn Officially Opened
05.18.2024 - NEWS
May 18, 2024 [Stena Oil]- On Tuesday, May 14th, Stena Oil’s new terminal in Frederikshavn was i... Read More
Axalta to Acquire the CoverFlexx Group, a Leading Aftermarket Coatings Business Focused on Economy Customers in North America
05.17.2024 - NEWS
May 17, 2024 [Axalta]- Axalta Coating Systems (NYSE: AXTA), a leading global coatings company, to... Read More
Airport Operator Groupe ADP Invests $20 Million in Sustainable Aviation Fuel Provider LanzaJet
05.17.2024 - NEWS
May 17, 2024 [ESG Today]- Sustainable aviation fuel (SAF) technology and production company Lanza... Read More