Gascade Plans Pipeline Linking LNG to German Gas Network Before Year-End
08.30.2022 By Ella Keskin - NEWS

August 30, 2022 [ Reuters ] – German pipeline operator Gascade said on Tuesday it would provide what is expected to be the first pipeline connecting liquid natural gas (LNG) to the German gas network.

 

The pipeline, measuring a few hundred meters in length, will connect a first floating storage regasification unit (FSRU) to a landing station near the town of Lubmin, according to Gascade.

The pipeline with a feed-in capacity of approximately 6 gigawatt-hours per hour should be built before the end of 2022, said Gascade.

Writing by Miranda Murray


Pro Trial: Access 11,340 Tank Terminal and Production Facilities

11,340 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Australia's Woodside Energy Makes Liz Westcott Its Permanent CEO
03.23.2026 - NEWS
March 23, 2026 [Reuters]- Australia’s Woodside Energy on Wednesday named Liz ​Westcott as... Read More
US Lends Oil Companies 45.2 Mln Barrels from Reserve, First Batch of Iran War
03.23.2026 - NEWS
March 23, 2026 [Reuters]- The Trump administration said on Friday it ​has lent 45.2 million bar... Read More
China's Sinopec Posts 36.8% Drop in 2025 Net Profit on Weak Petrochemical Margins, New Energy Substitution
03.23.2026 - NEWS
March 23, 2026 [Reuters]- China Petroleum & Chemical Corp , known as Sinopec, reported a 36.8... Read More
Saudi Aramco Cuts Oil Supply to Asia for Second Month in April
03.23.2026 - NEWS
March 23, 2026 [Reuters]- Saudi Aramco, the world’s top oil exporter, has cut crude supply ... Read More