New Tank Farm for Ust-Luga
07.05.2021 By Ricardo Perez - NEWS

July 5, 2021 [Sea News] – A new tank far is to be built on the territory of the condensed gas terminal in the port of Ust-Luga in the Russian Baltic.

 

The Main Department of State Expertize has approved the project documentation and engineering studies for the first stage of the project.

The project envisages building four steel tanks with a capacity of 40,000 cubic meters to store condensed gas as well as light and heavy naphtha made from it.

Other infrastructure to be developed includes a cable overpass, a pumping station for condensed gas and products, drainage tanks and other engineering structures and communications.

Additional roads connected to the road accesses to the port will be built, and the existing engineering network is to be modernized.

According to SeaNews PORTSTAT analytical online service, during January-May 2021 the terminal operated by Novatek Ust-Luga handled 2.87 mn tons, down 1.1% year-on-year.

Click Here to Access Today a 6,750 Tank Terminal Database With a Pro Trial

6,750 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Mexico’s Dos Bocas Refinery Starts Biting Into U.S. Fuel Exports
01.30.2026 - NEWS
January 30, 2026 [Oil Price]- For years, Mexico has been a major fuel buyer from the United State... Read More
Higher Refining Margins Push Valero’s Q4 Profit above Estimates
01.30.2026 - NEWS
January 30, 2026 [Oil Price]- Stronger refining margins and higher throughput volumes helped U.S.... Read More
Malaysia’s Petronas to Boost Exploration to Maintain Domestic Output
01.30.2026 - NEWS
January 30, 2026 [Oil Price]- Malaysia’s Petronas plans to boost exploration, deepwater develop... Read More
Hokkaido Electric to Build New Gas-Fired Plant, LNG Terminal by Mid-2030s
01.30.2026 - NEWS
January 30, 2026 [Reuters]- Hokkaido Electric Power said on Friday it will build a new gas-fired ... Read More