New Tank Farm for Ust-Luga
07.05.2021 By Ricardo Perez - NEWS

July 5, 2021 [Sea News] – A new tank far is to be built on the territory of the condensed gas terminal in the port of Ust-Luga in the Russian Baltic.

 

The Main Department of State Expertize has approved the project documentation and engineering studies for the first stage of the project.

The project envisages building four steel tanks with a capacity of 40,000 cubic meters to store condensed gas as well as light and heavy naphtha made from it.

Other infrastructure to be developed includes a cable overpass, a pumping station for condensed gas and products, drainage tanks and other engineering structures and communications.

Additional roads connected to the road accesses to the port will be built, and the existing engineering network is to be modernized.

According to SeaNews PORTSTAT analytical online service, during January-May 2021 the terminal operated by Novatek Ust-Luga handled 2.87 mn tons, down 1.1% year-on-year.

Click Here to Access Today a 6,750 Tank Terminal Database With a Pro Trial

6,750 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Port of Newcastle Completes Feed Studies for Green Hydrogen Project
12.05.2025 - NEWS
December 05, 2025 [Renewables Now]- Port of Newcastle has completed front-end engineering design ... Read More
CHS, Energy Partners Opening New Rail Terminal in Montana
12.05.2025 - NEWS
December 05, 2025 [LPGas Magazine]- When the temperatures drop each winter, Montana propane marke... Read More
BPGIC Begins Planning for Fujairah’s First Euro 5-Grade Gasoline Refinery
12.05.2025 - NEWS
December 05, 2025 [Global Flow Control]- Brooge Petroleum and Gas Investment Company (BPGIC), a s... Read More
Var Energi Makes Oil Discovery Near Arctic Field in Norway
12.05.2025 - NEWS
December 05, 2025 [Oil Price]- Var Energi confirmed on Thursday an oil discovery very close to ... Read More