Iran Operates 2 Liquefied Petroleum Gas Tanks
02.01.2021 By Ricardo Perez - NEWS

February 1st, 2021 [Menafn] – According to the head of Iran’s Pars Oil and Gas Company (POGC), two liquefied petroleum gas (LPG) storage tanks of phase 22-24 of Iran’s South Pars gas field have gone prepared and ready to save 80,000 cubic meters of gas.

 
An amount of four storage tanks, including two propane and two butane tanks, have been built for the stated phases, two of which have been finished and ready for receiving gas, stated Mohammad Meshkinfam.

After cooling the natural gas, the loading of the propane tank with a capability of 45,000 cubic meters and the butane tank with a capacity of 35,000 cubic meters will start, he further said.

The construction of the remaining two storage tanks has also been finished and POGC is waiting to get the needed propane and butane pumps from Iran Industrial Pumps Company to commission these two tanks as well, he added.

——

Click Here to Access Today a 6,000 Tank Terminal Database With a Pro Trial
6,350 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Port of Newcastle Completes Feed Studies for Green Hydrogen Project
12.05.2025 - NEWS
December 05, 2025 [Renewables Now]- Port of Newcastle has completed front-end engineering design ... Read More
CHS, Energy Partners Opening New Rail Terminal in Montana
12.05.2025 - NEWS
December 05, 2025 [LPGas Magazine]- When the temperatures drop each winter, Montana propane marke... Read More
BPGIC Begins Planning for Fujairah’s First Euro 5-Grade Gasoline Refinery
12.05.2025 - NEWS
December 05, 2025 [Global Flow Control]- Brooge Petroleum and Gas Investment Company (BPGIC), a s... Read More
Var Energi Makes Oil Discovery Near Arctic Field in Norway
12.05.2025 - NEWS
December 05, 2025 [Oil Price]- Var Energi confirmed on Thursday an oil discovery very close to ... Read More