Iran Operates 2 Liquefied Petroleum Gas Tanks
02.01.2021 By Ricardo Perez - NEWS

February 1st, 2021 [Menafn] – According to the head of Iran’s Pars Oil and Gas Company (POGC), two liquefied petroleum gas (LPG) storage tanks of phase 22-24 of Iran’s South Pars gas field have gone prepared and ready to save 80,000 cubic meters of gas.

 
An amount of four storage tanks, including two propane and two butane tanks, have been built for the stated phases, two of which have been finished and ready for receiving gas, stated Mohammad Meshkinfam.

After cooling the natural gas, the loading of the propane tank with a capability of 45,000 cubic meters and the butane tank with a capacity of 35,000 cubic meters will start, he further said.

The construction of the remaining two storage tanks has also been finished and POGC is waiting to get the needed propane and butane pumps from Iran Industrial Pumps Company to commission these two tanks as well, he added.

——

Click Here to Access Today a 6,000 Tank Terminal Database With a Pro Trial
6,350 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Heikki Malinen Appointed as the President and CEO of Neste
05.03.2024 - NEWS
May 03, 2024 [Petrol Plaza]- Neste Corporation’s Board of Directors has appointed Heikki Maline... Read More
Belgian Port Plans to Build €250m Hydrogen and Ammonia Export Terminal in Namibia
05.03.2024 - NEWS
May 03, 2024 [Esquare]- The Port of Antwerp-Bruges plans to build a €250 million ($267 million)... Read More
European Commission Grants €720 Million to Renewable Hydrogen Projects
05.03.2024 - NEWS
May 03, 2024 [Offshore Energy]- European Commission has awarded nearly €720 million to seven re... Read More
Rotterdam LNG Bunkering Volumes Jump in Q1
05.03.2024 - NEWS
May 03, 2024 [LNG Prime]- LNG bunkering volumes in the Dutch port of Rotterdam reached a record l... Read More