Iran Operates 2 Liquefied Petroleum Gas Tanks
02.01.2021 By Ricardo Perez - NEWS

February 1st, 2021 [Menafn] – According to the head of Iran’s Pars Oil and Gas Company (POGC), two liquefied petroleum gas (LPG) storage tanks of phase 22-24 of Iran’s South Pars gas field have gone prepared and ready to save 80,000 cubic meters of gas.

 
An amount of four storage tanks, including two propane and two butane tanks, have been built for the stated phases, two of which have been finished and ready for receiving gas, stated Mohammad Meshkinfam.

After cooling the natural gas, the loading of the propane tank with a capability of 45,000 cubic meters and the butane tank with a capacity of 35,000 cubic meters will start, he further said.

The construction of the remaining two storage tanks has also been finished and POGC is waiting to get the needed propane and butane pumps from Iran Industrial Pumps Company to commission these two tanks as well, he added.

——

Click Here to Access Today a 6,000 Tank Terminal Database With a Pro Trial
6,350 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Asian oil demand returns as global balances tighten
07.14.2026 - NEWS
July 14, 2026 [StoneX]- Asian oil demand is rebounding after a sharp drop during the Middle East ... Read More
Oil giants to gain ‘billions’ from Iran war
07.14.2026 - NEWS
July 14, 2026 [New York Post]- Oil giants like Exxon, Chevron, and Shell are set to gain billions... Read More
IEA warns return to war will upend oil market recovery
07.14.2026 - NEWS
July 14, 2026 [Argus Media]- The IEA warned that any return to conflict between the US and Iran c... Read More
Venture Global's liquefaction fees jump 69% on higher LNG prices
07.14.2026 - NEWS
July 14, 2026 [Reuters]- Venture Global’s average liquefaction fee surged 69% in the second qua... Read More