Pemex Looks to Expand Storage Capacity After COVID-19 Impact
01.18.2021 By Ricardo Perez - NEWS

January 18, 2021 [BN Americas] – After scrambling last year to quickly expand storage capacity in the wake of the COVID-19 pandemic, Mexican oil and gas giant Pemex is furthering plans to store 3Mb (million barrels) of crude oil inside refurbished salt deposits in Veracruz state.

 
Logistics subsidiary Pemex Logística submitted the project for environmental approval in December, according to information from the country’s security, energy and environment regulator (Asea).

It would involve the creation of two caverns in the Ixhuatlán municipality to store maya and itsmo crude, each with space for 1.5Mb. In total, they would occupy an area of 2ha.

No further details were disclosed about the project.

As of April 2020, Mexico had capacity to store 11Mb of crude. That same year Pemex saw its capacity strained as fuel demand plummeted due to the pandemic and stocks began to accumulate in the global oil industry.

At the time, Pemex subsidiary Transformación Industrial said it had plans to increase capacity by using refurbished salt caverns in Nuevo León state and Veracruz after it successfully rented salt domes in 2017 from chemical provider Cydsa to store excess LPG.

The firm also briefly used depleted wells to store excess production.

Internationally, salt deposits have often been used to store crude as they are viewed as a low-cost option for long-term storage. The US uses this method as part of its Strategic Petroleum Reserve.

——

Click Here to Access Today a 6,000 Tank Terminal Database With a Pro Trial
6,300 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Heikki Malinen Appointed as the President and CEO of Neste
05.03.2024 - NEWS
May 03, 2024 [Petrol Plaza]- Neste Corporation’s Board of Directors has appointed Heikki Maline... Read More
Belgian Port Plans to Build €250m Hydrogen and Ammonia Export Terminal in Namibia
05.03.2024 - NEWS
May 03, 2024 [Esquare]- The Port of Antwerp-Bruges plans to build a €250 million ($267 million)... Read More
European Commission Grants €720 Million to Renewable Hydrogen Projects
05.03.2024 - NEWS
May 03, 2024 [Offshore Energy]- European Commission has awarded nearly €720 million to seven re... Read More
Rotterdam LNG Bunkering Volumes Jump in Q1
05.03.2024 - NEWS
May 03, 2024 [LNG Prime]- LNG bunkering volumes in the Dutch port of Rotterdam reached a record l... Read More