Construction of New Kipevu Oil Terminal in Kenya at 63.2% Complete
10.12.2020 By Greta Talmaci - NEWS

October 12, 2020 [Pumps Africa] – Construction of the new Kipevu Oil Terminal is now at 63.2%. This is according to Kenya Ports Authority acting Managing Director Engineer Rashid Salim. The Managing Director explained that the works which began on February 2019, were slightly slowed down when Covid-19 struck the country in March.

 
“We experienced some delays because of Covid-19; however, we are now back on track and we expect to finish the construction works within the period that was set,” said Salim.

New Kipevu Oil Terminal

The new Kipevu Oil Terminal is being constructed directly opposite the second container terminal at the port of Mombasa near Dongo Kundu. It will replace the current 50-year-old terminal which is the first and the second container terminal. It is being funded by KPA at a cost of US $385m and built by the China Communications Construction Company.

Scope of work

Construction of the oil terminal is part of the authority’s expansion programme which is key to securing the country’s energy needs. Scope of the project’s works include construction of four berths, dredging, construction of sub-sea (submerged) pipelines for five different petroleum products. These are crude oil, heavy fuel oil and three types of white oil products (DPK-aviation fuel, AGO-Diesel and PMS-Petrol).

For the onshore works, the contractor is expected to put up onshore pipeline across the container terminal, construction of beach valve station, pipeline assembly yard and setting up of material testing laboratory among others. Dredging works were completed in November last year and marine pilling, which is the process of building deep foundations into the ground below sea level to support buildings and structures that are offshore started.

The new terminal has a timeline of 30 months and it is expected to be ready by August, 2021. Upon completion it is expected to have the capacity to handle four vessels of up to 100,000 tonnes and will have a Liquified Petroleum Gas line that is expected to help stabilise cooking gas supply in the country.

Currently the country depends on the old Kipevu Oil Terminal and the Shimanzi terminal near the Likoni Ferry channel to offload oil product, both of which can only handle one oil tanker at a time. The Kipevu Oil Terminal will supplement the two facilities at Shimanzi and the previous Kipevu terminal.

The new Kipevu Oil Terminal will have both subsea and land-based pipelines connecting it to the storage facilities in Kipevu, and the capacity to handle five different fuel products. These include crude oil, heavy fuel oil and three types of white oil products (DPK-aviation fuel, AGO-Diesel and PMS-Petrol).

————-

Click Here to Access Today a 5,550 Tank Terminal Database With a Pro Trial
5,550 terminals as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

Heikki Malinen Appointed as the President and CEO of Neste
05.03.2024 - NEWS
May 03, 2024 [Petrol Plaza]- Neste Corporation’s Board of Directors has appointed Heikki Maline... Read More
Belgian Port Plans to Build €250m Hydrogen and Ammonia Export Terminal in Namibia
05.03.2024 - NEWS
May 03, 2024 [Esquare]- The Port of Antwerp-Bruges plans to build a €250 million ($267 million)... Read More
European Commission Grants €720 Million to Renewable Hydrogen Projects
05.03.2024 - NEWS
May 03, 2024 [Offshore Energy]- European Commission has awarded nearly €720 million to seven re... Read More
Rotterdam LNG Bunkering Volumes Jump in Q1
05.03.2024 - NEWS
May 03, 2024 [LNG Prime]- LNG bunkering volumes in the Dutch port of Rotterdam reached a record l... Read More