Tallgrass to Develop Cushing-to-St. James Oil Pipeline, Terminal
08.03.2018 - NEWS

August 3, 2018 [Oil & Gas Journal] - Tallgrass Energy LP, Leawood, Kan., plans to build a crude oil pipeline from Cushing, Okla., to the St. James, La., refining complex, as well as a separate new export-capable liquids terminal near the mouth of the Mississippi River.


The 700-mile, 30-in. Seahorse Pipeline would transport as much as 800,000 b/d of oil and operate as a common grade batch system that, along with Tallgrass’ Pony Express Pipeline, would give US refiners and international markets access to “clean” barrels from five different production basins, the company said.

The proposed new Plaquemines Liquids Terminal (PLT), a joint development with Drexel Hamilton Infrastructure Partners LP, is being structured as a public-private partnership in concert with the Plaquemines Port & Harbor Terminal District, a Louisiana state agency.

The terminal is permitted for as much as 20 million bbl of storage and is expected to be fully operational in second-quarter 2020. PLT will have the ability to fully load and unload Post-Panamax vessels (each with a capacity of about 1 million bbl) and barges on multiple deepwater docks. Tallgrass anticipates building a separate offshore pipeline extension that would give PLT the capability of loading very large crude carriers by third-quarter 2021.

An initial open season for the proposed pipeline is expected to begin Aug. 15 and run for 45 days.

—————————-

TankTerminals.com – Research, Market and Expand Your Presence within the Tank Storage Industry. Learn more.

US LNG opportunities ‘lie beyond Permian basin’
12.07.2025 - NEWS
Dec 04, 2025 [ Gasworld ]- LNG project developers face a critical supply chain challenge that w... Read More
OTTCO affirms strategic role in driving Oman’s hydrogen goals
12.07.2025 - NEWS
December 5, 2025 – [Oman Observer] – Oman Tank Terminal Company (OTTCO), a subsidiar... Read More
Port of Newcastle Completes Feed Studies for Green Hydrogen Project
12.05.2025 - NEWS
December 05, 2025 [Renewables Now]- Port of Newcastle has completed front-end engineering design ... Read More
CHS, Energy Partners Opening New Rail Terminal in Montana
12.05.2025 - NEWS
December 05, 2025 [LPGas Magazine]- When the temperatures drop each winter, Montana propane marke... Read More