Another Company Plans to Build LNG Export Terminal in U.S.
03.02.2017 - NEWS

March 2, 2017 [OPIS] - Venture Global LNG said that its subsidiaries Venture Global Plaquemines LNG and Venture Global Gator Express have completed the preliminary review process with FERC and have now submitted the formal application requesting FERC's authorization to site, construct and operate the Plaquemines LNG export terminal and the Gator Express pipeline system in Louisiana.


The 20 million tons per year Plaquemines LNG facility will be constructed on a 632-acre site in Plaquemines Parish, Louisiana, at river mile marker 55 on the Mississippi River, approximately 30 miles south of New Orleans. The export facility includes over 7,000 feet of Mississippi River frontage with three LNG loading docks.

OPIS notes Cheniere Energy’s Sabine Pass terminal is the first LNG export terminal to come onstream in the U.S., and several more LNG terminal projects are under construction, under consideration, or awaiting federal permits. Most LNG terminal projects are concentrated on the Gulf Coast, with some on the East and West coasts. It is understood not all projects would materialize due to increased competition domestically and internationally.

Working with GE Oil & Gas as a strategic partner, Plaquemines LNG is utilizing GE’s plantwide LNG process system, incorporating a power, pretreatment and LNG liquefaction system.

Venture Global LNG said that it plans to be a long-term, low-cost producer of LNG, capitalizing on low-cost natural gas production in the U.S. Venture Global is developing LNG export terminals at both Plaquemines and Calcasieu Pass, totaling 30 million tons per year of capacity.

——————————

Access tank storage data on tank terminals worldwide and help your company grow locally or internationally. Learn more.

Heikki Malinen Appointed as the President and CEO of Neste
05.03.2024 - NEWS
May 03, 2024 [Petrol Plaza]- Neste Corporation’s Board of Directors has appointed Heikki Maline... Read More
Belgian Port Plans to Build €250m Hydrogen and Ammonia Export Terminal in Namibia
05.03.2024 - NEWS
May 03, 2024 [Esquare]- The Port of Antwerp-Bruges plans to build a €250 million ($267 million)... Read More
European Commission Grants €720 Million to Renewable Hydrogen Projects
05.03.2024 - NEWS
May 03, 2024 [Offshore Energy]- European Commission has awarded nearly €720 million to seven re... Read More
Rotterdam LNG Bunkering Volumes Jump in Q1
05.03.2024 - NEWS
May 03, 2024 [LNG Prime]- LNG bunkering volumes in the Dutch port of Rotterdam reached a record l... Read More