Filling of Primorsk-Vysotsk Pipeline with Diesel Fuel Commenced
02.18.2016 - NEWS

February 18, 2016 [PortNews IAA] - Filling of the new pipeline linking port Primorsk (Leningrad Region) with export terminal RPK-Vysotsk-Lukoil-II (Leningrad Region) commenced on February 17, 2016. All the documents between Transneft and Lukoil have been signed recently, a source close to Transneft - Port Primorsk LLC told IAA PortNews.


According to a different source, the filling started at 19:25, Moscow time. 

IAA PortNews earlier said that launching of the pipeline with annual capacity of 3 mln t of diesel fuel (with a possibility to be expanded to 3 mln t per year) was expected in November 2015.

Total volume of oil products shipped from RPK Vysotsk “LUKOIL-II» in 2015 decreased by 8.6% year-on-year to about 11 million tonnes. Statistics shows that oil product exports reached 10.75 million tonnes, coastal traffic volume was 290,000 tonnes.

Koncar, Siemens Energy to Build 22.5 Mln Euro Hydrogen Plant for INA
12.09.2025 - NEWS
December 09, 2025 [SeeNews]- Croatian electrical equipment manufacturer Koncar said on Friday it ... Read More
Cstar Sets January 2026 Start for Kribi Refinery Construction
12.09.2025 - NEWS
December 09, 2025 [Business in Cameroon]- Cstar has announced that an engineering mission will ar... Read More
UAE to Hike LNG Exports to Meet Soaring Global Demand
12.09.2025 - NEWS
December 09, 2025 [Oil Price]- The United Arab Emirates is growing its LNG exports to meet surgin... Read More
Russia Could Boost LPG Exports to China by 40% in 2026, Consultancy Says
12.09.2025 - NEWS
December 09, 2025 [Reuters]- Russia may increase liquefied petroleum gas supplies to China by 40%... Read More