Dalian to Complete Construction of Oil Terminal and Jetty on Changxing Island in Late 2011
08.09.2011 - NEWS

August 5, 2011 [C1 Energy] - Dalian in Northeast China’s Liaoning province is expected to complete construction of a 300,000-DWT oil jetty in Changxing Island at the end of 2011, according to a source with Dalian Port Oil Terminal Co (transliteration).


“The oil jetty came under construction in March 2010, with construction scheduled to last about one year and a half,” said the source, who is an engineering director of this project.
This jetty is scheduled to be equipped with 4.2 mln m3 of tanks in the future, said the source.
Dalian Port Oil Terminal also plans to begin construction of a 100,000-DWT jetty in the first half of 2012, according to market sources.
C1 reported previously that Brightoil was constructing a large oil tank farm in Changxing Island, together with a 300,000-DWT jetty.
Dalian Port Oil Terminal is a subsidiary of Dalian Port Group, engaged in the shipping and storage of petroleum products and liquid chemical products

Argentina’s YPF to Merge LNG Project with Rivals Venture
11.26.2024 - NEWS
November 26, 2024 [World Oil]- Argentine state-run energy company YPF SA will join a venture bein... Read More
EQT Announces $3.5 Billion Midstream Joint Venture with Blackstone Credit & Insurance
11.26.2024 - NEWS
November 26, 2024 [Blackstone]- EQT Corporation announced today that it has entered into a defini... Read More
Exclusive: Trump Prepares Wide-Ranging Energy Plan to Boost Gas Exports, Oil Drilling, Sources Say
11.26.2024 - NEWS
November 26, 2024 [Reuters]- Donald Trump’s transition team is putting together a wide-rang... Read More
TOPSOE is Selected Technology Provider by Indian Frontrunner in Green Ammonia, HYGENCO
11.26.2024 - NEWS
November 26, 2024 [Topsoe]- Topsoe, a global leader in carbon emission reduction technologies, ha... Read More