“Liongas cancels plans to build LNG terminal in Rotterdam”.
03.06.2010 - NEWS
March 6, 2010 [TankTerminals.com] - According to spokesman Harry van Rietschoten of 4Gas, of which Liongas is a subsidiary, the plan to build a new LNG terminal at the “Kop van de Beer” area in the Europoort section of the port of Rotterdam have been annulled.

The Liongas terminal, with a planned capacity of 12 bcmpa, would be the second LNG terminal in Rotterdam. The first LNG terminal, the GATE terminal which is a joint venture between the Gasunie and Vopak, is currently being constructed and expected to be operational in the second half of 2011. This terminal, which will have an initial capacity of 12 bcmpa, is located at the Maasvlakte 1, next to the existing MOT crude terminal.

Port of Newcastle Completes Feed Studies for Green Hydrogen Project
12.05.2025 - NEWS
December 05, 2025 [Renewables Now]- Port of Newcastle has completed front-end engineering design ... Read More
CHS, Energy Partners Opening New Rail Terminal in Montana
12.05.2025 - NEWS
December 05, 2025 [LPGas Magazine]- When the temperatures drop each winter, Montana propane marke... Read More
BPGIC Begins Planning for Fujairah’s First Euro 5-Grade Gasoline Refinery
12.05.2025 - NEWS
December 05, 2025 [Global Flow Control]- Brooge Petroleum and Gas Investment Company (BPGIC), a s... Read More
Var Energi Makes Oil Discovery Near Arctic Field in Norway
12.05.2025 - NEWS
December 05, 2025 [Oil Price]- Var Energi confirmed on Thursday an oil discovery very close to ... Read More