Westway starts $3.8 million port expansion
08.27.2009 By Ricardo Perez - NEWS

Westway Terminal Co. LLC broke ground today at the Port of Greater Baton Rouge on a $3.8 million expansion to its Port Allen facility.

 
Expansion plans include the construction of four 1 million-gallon bulk liquid storage tanks, which will expand the terminal’s capabilities by 25 percent.
 
Upon completion, the terminal will have 22 bulk liquid storage tanks with a total capacity of 21 million gallons.
 
The project will generate 15-20 local construction jobs and add two full-time employees,” according to terminal manager Terry Fleming.
 
Engineering for the project was provided by Neel-Schaffer Engineering of Baton Rouge. Tank foundations will be constructed by Beard Construction Co. of Port Allen. Contractors for the expansion include Performance Contractors of Baton Rouge, providing piping and mechanical work for the project, and Pasadena Tanks Corp. of Houston for tank erection.

Port of Newcastle Completes Feed Studies for Green Hydrogen Project
12.05.2025 - NEWS
December 05, 2025 [Renewables Now]- Port of Newcastle has completed front-end engineering design ... Read More
CHS, Energy Partners Opening New Rail Terminal in Montana
12.05.2025 - NEWS
December 05, 2025 [LPGas Magazine]- When the temperatures drop each winter, Montana propane marke... Read More
BPGIC Begins Planning for Fujairah’s First Euro 5-Grade Gasoline Refinery
12.05.2025 - NEWS
December 05, 2025 [Global Flow Control]- Brooge Petroleum and Gas Investment Company (BPGIC), a s... Read More
Var Energi Makes Oil Discovery Near Arctic Field in Norway
12.05.2025 - NEWS
December 05, 2025 [Oil Price]- Var Energi confirmed on Thursday an oil discovery very close to ... Read More